Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Main & Colfax Parking Structure Repairs 2019 <br />Project Number: <br />For Bids Due: <br />115-143a <br />December 11, 2018 <br />Contractor Name: D. C. Byers Co./Detroit Inc. <br />e <br />PHI.' <br />BASE <br />BID PART#2 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Contractor Mobilization <br />1 <br />LS <br />$20,000 <br />2 <br />Contractor General Requirements <br />1 <br />LS <br />$7000 <br />3 <br />_4... <br />Center Curb, Concrete Remove <br />m <br />27 <br />SYS <br />$200 <br />$5400 <br />Sidewalk Concrete, Remove <br />9 <br />SYS <br />$300 <br />$2700 <br />5 <br />Trench Drain Remove <br />31 <br />LF <br />$50 <br />$1550 <br />6 <br />Smooth Surface at Sidewalk Removal <br />25 <br />SYS <br />$200 <br />$5000 <br />7 <br />Sidewalk Concrete _ <br />9 <br />SYS <br />$300 <br />$2700 <br />8 <br />Curb Island, Concrete 6 Inch <br />24 <br />SYS <br />$300 <br />$7200 <br />9 <br />Clean and Paint <br />1 <br />LS <br />$7000 <br />10 <br />Pipe, Storm, Circular, 8 Inch <br />5 <br />LF <br />$100 <br />$500 <br />11 <br />Trench Drain, Retrofit <br />37 <br />LF <br />$100 <br />$3700 <br />12 <br />Inlet, Type R with Casting <br />1 <br />EACH <br />$200 <br />$200 <br />13 <br />Bollard, Relocate <br />12 <br />EACH <br />$200 <br />$2400 <br />14 <br />Sign, Sheet, Remove <br />24 <br />EACH <br />$100 <br />$2400 <br />15 <br />Sign, Sheet, Relocate <br />83 <br />EACH <br />$200 <br />$16,600 <br />16 <br />Sign, Sheet, with Legend, 0.080 Inch <br />36 <br />SF <br />$100 <br />$3600 <br />17 <br />Parkin Exit Equipment, Remove & <br />e _ _ <br />1 <br />EACH <br />$5000 <br />Sarki <br />18 <br />Parking Exit Equipment, Relocate <br />1 <br />EACH <br />$15,000 <br />19 <br />Parking Entry Equipment, Relocate <br />1 <br />EACH <br />$15,000 <br />20 <br />Illuminated Sign <br />4 <br />EACH <br />_ $2000 <br />$8000 <br />21 <br />Pavement Message Marking, Remove <br />29 <br />SYS <br />$100 <br />$2900 <br />22 <br />Line, Paint, Yellow, 8 Inch <br />180 <br />LF <br />$? <br />$360 <br />23 <br />Line, Paint, Yellow, 4 Inch <br />21,320 <br />LF <br />$.50 <br />$10,660 <br />24 <br />Line, Remove <br />21,500 <br />LF <br />$2 <br />$43,000 <br />25 <br />Pavement Marking , Paint, Handicap <br />8 <br />EACH <br />$100 <br />$800 <br />Symbol <br />26 <br />Bollard <br />2 <br />EACH <br />$700 <br />$1400 <br />BASE <br />BID PART <br />#2 TOTAL <br />$190,070.00 <br />Version 7/20/2018 Contractor's Bid for Public Works - 8 Addendum #1 <br />