Laserfiche WebLink
SAIA Document G701" - 20,17 <br />Change Order <br />PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: <br />17043 - Erskine Clubhouse Renovation Contract For: General Construction Change Order Number: 03 <br />Date: 8/28/18 Date: 11/9/18 <br />OWNER: (Name and address) <br />ARCHITECT: (Name and address) <br />CONTRACTOR: (Name and address) <br />Board of Public Works <br />Gregory A. Kil & Associates, Inc. <br />Ziolkowski Construction Co., Inc. <br />City Of South Bend, Indiana <br />1316 County City Building <br />(d/b/a) Kil Architecture / Planning <br />4050 Ralph Jones Drive <br />227 W Jefferson Bouldvard <br />1126 Lincolnway East <br />South Bend, IN 46628 <br />South Bend, IN 46601-1830 <br />South Bend, IN 46601 <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments <br />attributable to executed Construction Change Directives.) <br />Per the attached RCO#007 Revised, add $10,471.00 for labor, material and equipment to remove existing gutter System on the south side of <br />clubhouse and install new as shown on attached drawings. <br />The original Contract Sum was $ 907,000.00 <br />The net change by previously authorized Change Orders $ 7,899.00 <br />The Contract Sum prior to this Change Order was $ 914,899.00 <br />The Contract Sum will be increased by this Change Order in the amount of $ 10,471.00 <br />The new Contract Sum including this Change Order will be $ 925,370.00 <br />The Contract Time will be increased by Zero (0) days. <br />The new date of Substantial Completion will be March 22, 2019 <br />NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract <br />Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br />Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER <br />Gregory A. Kil & Associates, Inc. <br />A r t name) <br />SIG A <br />— nt`;. r IHNCAR'li , AIA Architect <br />PR TED N ME ND TITLE <br />�— <br />DATE <br />Ziolkowski Construction Co. Board of Public Works, City of South <br />He°nd„ IN "IX�VMIPI <br />CONTRACTOR (Firm name) OWNER (M ) <br />of <br />SIGNATURE SIGNATURE DEC- 1 1 1 <br />1 Mw <br />PRINTED NAME ANDITITLE PRINT <br />DATE DATE <br />q <br />AIA Document G701 TM — 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. WAll?NtplINQ This <br />a�;aurrnrnnp s f ected by US Ca pyro^rigllht. Law and i nt�ein�naUornll Vrratloa, Unauthorized uspFodiiAcUain or dGstii 1pnuft n of tlhnp�s AIIA" Document, or, <br />IIA�' Iltan � is ou��a�at <br />aunyy poi°ffoun of 01, irnayp iesuufil in seveii,o a.Mll aund r,iu°uindinai! Ipoinaanities, and MH he p hose.¢ uteri to the irnnaxhill irmn extent imssl!!We uuund eu° the iawrv, This <br />document was produced by AIA software at 13:45:57 ET on 11/09/2018 under Order No 4082306517 which expires on 11/09/2019, and is not for resale, <br />User Notes: (3139ADA54) <br />