r
<br />November 30,2018
<br />City of South Bend
<br />3113 Riverside Drive
<br />South Bend, IN 46628
<br />Attention: Jacob M. Klosinski, PE
<br />Black & Veatch Corporation
<br />8415 Allison Pointe Blvd, Suite 410, Indianapolis, IN 46250
<br />P +1 317 570-8331 E CheslekHA@bv.com
<br />South Bend WWTP Electrical Improvements
<br />B&V Project 199409
<br />B&V File 12.2100
<br />Letter No. 01
<br />Subject: Review and Evaluation of Bids for the 117-132 South Bend Wastewater Treatment
<br />Plant Electrical Improvements project.
<br />Sealed bids for Project No. 117-132, City of South Bend Wastewater Treatment Plant Electrical
<br />Improvements, were received and opened at 9:30 a.m. on November 27, 2018, in a meeting of the
<br />City of South Bend Board of Works (BOW) in its Meeting Room, 13th floor, 1308 County -City
<br />Building. Bids were received from three bidders.
<br />Base bids submitted by the three bidders were $6,147,000, $6,750,000, and $7,730,770. The
<br />Engineer's opinion of probable construction cost for the base bid was $6,096,000. A tabulation of
<br />bids received from the three bidders is presented below. The apparent low bidder for the project is
<br />Martell Electric, LLC of South Bend, Indiana.
<br />..............................................................................
<br />Bidder Base Bid
<br />.......................
<br />Alternates
<br />Alternates
<br />Alternates
<br />Alternates
<br />Item No. 1
<br />Item No. 2
<br />Item No. 3
<br />Item No. 4
<br />Total
<br />Martell Electric, LLC $6,147,000-$52,690
<br />-
<br />$88,410
<br />$44,240
<br />$185,340
<br />....__
<br />Sweney Electric Co., Inc. $6,750,000
<br />................_
<br />$24,000
<br />........................... .
<br />$114,000
<br />$24,000
<br />$162,000
<br />---
<br />J. Ranck Electric, Inc. $7,730,770
<br />$33,235
<br />_...... _........... __
<br />$46,788
<br />.....
<br />$31,625
<br />.
<br />$111,648
<br />The City provided Black & Veatch the submitted bid packages for evaluation. All bidders have
<br />acknowledged having contractor certification in the State of Indiana, bonding capacity, and
<br />experience to complete the project. Where provided, proposed subcontractors and suppliers
<br />appear to be qualified to perform their proposed work. All other documents required to be
<br />submitted with the bid appear to be satisfactory and in compliance with the Bidding Documents,
<br />less the following items noted during review:
<br />1) "Write-in" values on the "Part I Bid Form" requiring the sum of Total Base Bid plus
<br />Alternates shown on the Proposal for Martell Electric and J. Ranck Electric only include Base
<br />Bid Item No. 1 and not the base bid plus alternates.
<br />2) "Write-in" value on the "Part I Bid Form" for date of plans and specifications prepared by
<br />Black & Veatch Corporation for Martell Electric incorrectly entered as the bid due date
<br />"11/13/2018" and not "10/17/18."
<br />3) "Write-in" value on the "Bid/Proposal" for Contractor Name for J. Ranck Electric is blank.
<br />4) "Write-in" values on the "Bid/Proposal" for Unit Price for Sweney Electric are blank.
<br />BUILDING A WORLD OF DIFFERENCE'
<br />.,�'�'`✓`r',r�✓'.r'r�✓'�✓"'.�'.�°'r"�r�r�'.�✓�'r'�r��.r��r�'/"r"r'r".'i�r''r