Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name South Bend Fire Department Training Center Classroom Building <br />Project No. 117-127R <br />For Bids Due November 27, 2018 <br />�31'can Brown CrIC�� <br />Contractor Name: ��n�fCtc�rs Inc. <br />BASE BID <br />........ W_ <br />Item No. Description Total Amount <br />BASE BID <br />1 covers construction of the Classroom Addition and two vehicle $ 570f <br />apparatus bay according to the intent of the Plans and <br />Specifications <br />BASE BID TOTAL $ �`�� <br />ALTERNATE #1 (ADD) <br />Item No. <br />Description <br />Total Amount <br />Provide costs for removal of existing stone and installation of turf in <br />q <br />/ �✓ <br />1 <br />area designated on Site Demolition Plan and Site Grading / Utility <br />$ U� <br />Plan. <br />ALTERNATE #1 TOTAL $ ` <br />ALTERNATE #2 1ADD) <br />Item No. <br />Description <br />Total Amount <br />Provide metal roof panels in lieu of asphalt shingles. <br />• Include addition of 30# synthetic roofing underlayment and <br />2 <br />W exterior roofing sheathing in lieu of sheathing and <br />$ <br />underlayment shown. <br />• Include snow guard rails at all roof overhangs. <br />ALTERNATE #2 TOTAL $ q — <br />ALTERNATE #3 fADDI <br />Item No. <br />Description <br />Total Amount <br />3 <br />Provide ground face CMU wainscot and cast stone sill shown, base <br />bid to include metal panel siding and associated furring and trims to <br />$ <br />the base of the wall. <br />ALTERNATE #3 TOTAL $ q <br />ALTERNATE #4 ADD <br />Item No. Description Total Amount <br />Provide movable partition between Classroom A and B. <br />4 w Include steel beam, columns and footings shown along with $ <br />the framing of the opening for the partition track. Soffit ) <br />between classrooms to be oast of the base bid. <br />ALTERNATE #4 TOTAL $ r <br />Version 7/20/2018 Contractor's Bid for Public Works - 7 <br />