My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 Minutes
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
06-14-12 Packet
>
2 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 10:04:49 AM
Creation date
6/11/2012 1:17:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br />Regular Meeting —May 31, 2012 <br />6. NEW BUSINESS (CONT.) <br />C. West Washington - Chapin Development Area <br />(1) continued... <br />an Addendum to the Master Agency <br />Agreement with the Board of Public Works <br />(Rushton Rehab Project). <br />D. South Side Development Area <br />(1) Resolution No. 3037 approving and <br />authorizing execution of an Amendment to <br />the Addendum to the Master Agency <br />Agreement with the Board of Public <br />Works (Fellows Street Corridor <br />Improvement Project — Supplement #2). <br />Mr. Schalliol noted that in April, 2011, the <br />Commission approved the original addendum <br />for this project which hired Christopher B. <br />Burke Engineering Ltd. staff to help <br />coordinate study of the traffic circulation of <br />Fellows and Ireland and Fellows Street north <br />to Chippewa. The purpose of this <br />infrastructure study was based on the INDOT <br />plan to construct a bridge over the U.S. 20 <br />Bypass and build a new connector roadway <br />on the Fellows Street alignment from Gilmer <br />Park south of the bypass to the intersection of <br />Ireland and Fellows. The state anticipates <br />that roadway to be completed in 2013. <br />The Phase 2 proposal, approved by the <br />Commission in December, 2011, segmented <br />design work into three phases including (1) <br />Design Services, (2) Rule 5 Permit (IDEM) <br />and (3) Bid Services. Over the course of the <br />Phase 2 design work, a major redesign was <br />done, which shifted the project to the east <br />side of Fellows based on drainage and <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.