My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - JPR Corp - Guardrail Replacement Design
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - JPR Corp - Guardrail Replacement Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:33:01 AM
Creation date
11/28/2018 10:52:28 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
for or entitlement to special, incidental, indirect, or consequential damages arising out of, resulting <br />from, or in any way related to the Project, and (2) agree that Engineer's total liability to Owner <br />under this Agreement shall be limited to $50, or the total amount of compensation received by <br />Engineer, whichever is greater. <br />I. The parties acknowledge that Engineer's scope of services does not include any services related to a <br />Hazardous Environmental Condition (the presence of asbestos, PCBs, petroleum, hazardous <br />substances or waste as defined by the Comprehensive Environmental Response, Compensation and <br />Liability Act, 42 U.S.C. §§9601 et seq., or radioactive materials). If Engineer or any other party <br />encounters a Hazardous Environmental Condition, Engineer may, at its option and without liability <br />for consequential or any other damages, suspend performance of services on the portion of the <br />Project affected thereby until Owner: (1) retains appropriate specialist consultants or contractors to <br />identify and, as appropriate, abate, remediate, or remove the Hazardous Environmental Condition; <br />and (2) warrants that the Site is in full compliance with applicable Laws and Regulations. <br />I Owner and Engineer agree to negotiate each dispute between them in good faith during the 30 days <br />after notice of dispute. If negotiations are unsuccessful in resolving the dispute, then the dispute <br />shall be mediated. If mediation is unsuccessful, then the parties may exercise their rights at law. <br />6.01 Total Agreement <br />A. This Agreement (including any expressly incorporated attachments), constitutes the entire <br />agreement between Owner and Engineer and supersedes all prior written or oral understandings. <br />This Agreement may only be amended, supplemented, modified, or canceled by a duly executed <br />written instrument. <br />7.01 Basis of Payment —Hourly Rates Plus Reimbursable Expenses <br />A. Using the procedures set forth in Paragraph 2.01, Owner shall pay Engineer as follows: <br />1. An amount equal to the cumulative hours charged to the Project by each class of Engineer's <br />employees times standard hourly rates for each applicable billing class for all services <br />performed on the Project, plus reimbursable expenses and Engineer's consultants' charges, <br />if any. <br />2. Engineer's Standard Hourly Rates are attached as Appendix 1. <br />3. The total compensation for services and reimbursable expenses is estimated to be $39,515. <br />Attachments: Appendix 1, Engineer's Standard Hourly Rates <br />Page 5 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />g _ Society of Professional Engineers for EJCDC. All ri hts reserved. <br />Co r� ht O 2008 National Socie IT _ .... <br />
The URL can be used to link to this page
Your browser does not support the video tag.