My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - DLZ Indiana LLC - Design Services for Washington and LaPorte St Intersection
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - DLZ Indiana LLC - Design Services for Washington and LaPorte St Intersection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:21:27 AM
Creation date
11/28/2018 10:51:51 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
written authorization from Owner. Engineer shall cease performing or furnishing <br />such Additional Services upon receipt of written notice from Owner. <br />1. Services in connection with work change directives and change orders to reflect <br />changes requested by Owner. <br />2. Services in making revisions to Drawings and Specifications occasioned by the <br />acceptance of substitute materials or equipment other than "or -equal" items; <br />services after the award of the Construction Contract in evaluating and <br />determining the acceptability of a proposed "or equal" or substitution which is <br />found to be inappropriate for the Project; evaluation and determination of an <br />excessive number of proposed "or equals" or substitutions, whether proposed <br />before or after award of the Construction Contract. <br />3. Services resulting from significant delays, changes, or price increases occurring <br />as a direct or indirect result of materials, equipment, or energy shortages. <br />4. Additional or extended services during construction made necessary by (1) <br />emergencies or acts of God endangering the Work (advance notice not <br />required), (2) the presence at the Site of any Constituent of Concern or items of <br />historical or cultural significance, (3) Work damaged by fire or other cause <br />during construction, (4) a significant amount of defective, neglected, or delayed <br />work by Contractor, (5) acceleration of the progress schedule involving <br />services beyond normal working hours, or (6) default by Contractor. <br />5. Services (other than Basic Services during the Post -Construction Phase) in <br />connection with any partial utilization of any part of the Work by Owner prior <br />to Substantial Completion. <br />6. Evaluating an unreasonable claim or an excessive number of claims submitted <br />by Contractor or others in connection with the Work. <br />7. Reviewing a Shop Drawing more than three times, as a result of repeated <br />inadequate submissions by Contractor. <br />8. While at the Site, compliance by Engineer and its staff with those terms of <br />Owner's or Contractor's safety program provided to Engineer subsequent to the <br />Effective Date that exceed those normally required of engineering personnel by <br />federal, state, or local safety authorities for similar construction sites. <br />Exhibit A — Page 7 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.