Laserfiche WebLink
3. Progress Payments; - <br />a. The portion of the amounts billed for Engineer's services which is on account of the <br />Percentage of Construction Cost will be based upon Engineer's estimate of the <br />percentage of the total services actually completed during the billing period. <br />b. Upon conclusion of each phase of Basic Services, Owner shall pay such additional <br />amount, if any, as may be necessary to bring total compensation paid during such phase <br />on account of the percentage of Construction Cost to the following estimated <br />percentages of total compensation payable on account of the percentage of Construction <br />Cost for all phases of Basic Services: <br />Study and Report Phase % <br />Preliminary Design Phase % <br />Final Design Phase % <br />Bidding or Negotiating Phase % <br />Construction Phase % <br />100% <br />c. Engineer may alter the distribution of compensation between individual phases of the <br />work noted herein to be consistent with services actually rendered, but shall not exceed <br />the total estimated compensation amount unless approved in writing by Owner. <br />Page 2 <br />Exhibit C — Compensation Packet BC-3: Basic Services (other than RPR) —Percentage of Construction Cost Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright c0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />