Laserfiche WebLink
Alternate No. 1: Exterior Medallion Salvage <br />• Laborers will access the medallions from a man lift. <br />• Chipping guns or a gas saw will be used to separate the medallions from the adjacent brick. <br />• Care will be used during removal to avoid damage to the pieces. <br />• Before each piece is cut free, the piece will be rigged to either an excavator or chain fall to lower the <br />piece. <br />• Once the pieces are lowered, they will be placed on a pallet and secured with shrink-wrap. <br />• The pieces will then be loaded and transported to the City of South Bend Olive Street Water Treatment <br />Plant where they will be unloaded. <br />Page 1 of 1 <br />Omega III LLC Equal Opportunity Employer <br />31WS66 Spaulding Road WWW.OMEGA3LLC.COM P: (630) 837-3000 <br />Elgin, IL 60120 F: (630) 837-2300 <br />