My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2 - Fire Station No 9 Project No 116-012 - Ziolkowski Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Change Orders
>
Change Order No 2 - Fire Station No 9 Project No 116-012 - Ziolkowski Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 1:46:09 PM
Creation date
11/28/2018 10:16:07 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Wit <br />MW <br />�"tl'dl�W, i.... <br />�dNNld�tpyMrydE76UMIBVUI6N1Nna4AYR�t'�Il e�✓i'uuu117A�IIIPRI�I�If�gq��pl�Yd�'JAW!y;G:,9i0!'I�LhYVJi..IIPrAIlYh'8S1.h1VR�W1'�FbJ1FF�4Yddli�i@IEY�m7mtW'tA,WrygdlU/6�"a".W;�7//7AMo'SIN.Ti19MIFYG7P�/��YI@iYNldh91YII.;NavN,'Jg�(pillltldl"'F('��V(fII�I G&f@�'�V�Ti71Jv�',�FIkTl�P7�iGV <br />Ziolkowski Construction <br />4050 Ralph Jones Drive <br />South Bend, Indiana 46628 <br />Attn: Jeff Cerney <br />File Station 49- PR # 3 <br />50654 Tcall .Road. <br />i rislol, In 46507 <br />1`ax :574) 855-35 2 <br />(..roll (57 334-0259 <br />Quote C10518-3 <br />September 18, 2018 <br />We are pleased to submit our electrical proposal for the electrical work at the above referenced <br />project. Our electrical scope is as follows: <br />Price includes the following <br />o Directional bore 2- 2" conduits from the north side of Mishawaka Avenue to <br />the south side where the new ]land holes are indicated. <br />o Price includes connecting new conduits to existing hand hole <br />o Price includes Pull Strings <br />o Price includes 2 new hand holes <br />o Second hand hole only has 1- 3" from the building going to it. <br />o Price reflects a credit for the difference of the 80' of conduit used and the <br />210' we had included on bid day. Credit is $1,900.00 <br />Price does not include any removal of concrete, asphalt etc... <br />Ifhand holes are to be in sidewalk we have not included any work for repairing of <br />this. <br />Price <br />Not to Exceed <br />Fifteen Thousand Three Hundred and 00/100 dollws $ 15,300.00 <br />(Sales tax excluded) <br />Terms and Conditions <br />Warranties <br />- Engineering —Elite Electric will guarantee its engineering fiom defects for a period of one year. <br />- Hardware — Manufacturer's warranties will apply to all equipment covered in this proposal. <br />- Warranty Exclusions — Elite Electric will not replace or warrant damage due to negligence, vandalism or acts <br />of God. <br />Elite Eleetric Pagel oft <br />
The URL can be used to link to this page
Your browser does not support the video tag.