My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2 - Fire Station No 9 Project No 116-012 - Ziolkowski Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Change Orders
>
Change Order No 2 - Fire Station No 9 Project No 116-012 - Ziolkowski Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 1:46:09 PM
Creation date
11/28/2018 10:16:07 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fire Station #9 <br />i <br />ARCHITECTURE + PLANNING <br />August 20, 2018 <br />Project No.: 116-012 Issued ®ate: 08/20/18 <br />Project Name: Fire Station #9 No. of Pages: 1 <br />Owner: Board of Public Works, City of South Bend <br />Architect: EPOCH Architecture + Planning <br />This is not a change directive to scope of work. Contractor to provide costs associated with the <br />proposed changes for owner consideration. <br />Item dumber 1: <br />Provide price for directional biting and approximately 70' of 2" schedule 80 pipe with tracer wire plus <br />one concrete hand hole. Concrete hand hole per City Standards. This will connect the fiber across <br />Mishawaka Ave. <br />Item Number 2: <br />Run 3" schedule 80, approximately 40' from the new hand hole described in Item Number 1 south to the <br />building. Provide credit to owner for the difference to run the 3" conduit to hand hole versus the <br />allotted 210'. <br />Item Number 3: <br />Provide price to furnish and install a secondary hand hole adjacent to the MetroNet hand hole far the <br />second 3" conduit running from the building. This conduit may be used cable and telecommunication <br />utilities to the building. Provide credit to owner for the difference to run the 3" conduit to hand hole <br />versus the allotted 210'. <br />Attachments: <br />C3-100 Sketch <br />116-012 / 17C037 Page I 1 PR #003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.