Laserfiche WebLink
Fire Station #9 <br />i <br />ARCHITECTURE + PLANNING <br />August 20, 2018 <br />Project No.: 116-012 Issued ®ate: 08/20/18 <br />Project Name: Fire Station #9 No. of Pages: 1 <br />Owner: Board of Public Works, City of South Bend <br />Architect: EPOCH Architecture + Planning <br />This is not a change directive to scope of work. Contractor to provide costs associated with the <br />proposed changes for owner consideration. <br />Item dumber 1: <br />Provide price for directional biting and approximately 70' of 2" schedule 80 pipe with tracer wire plus <br />one concrete hand hole. Concrete hand hole per City Standards. This will connect the fiber across <br />Mishawaka Ave. <br />Item Number 2: <br />Run 3" schedule 80, approximately 40' from the new hand hole described in Item Number 1 south to the <br />building. Provide credit to owner for the difference to run the 3" conduit to hand hole versus the <br />allotted 210'. <br />Item Number 3: <br />Provide price to furnish and install a secondary hand hole adjacent to the MetroNet hand hole far the <br />second 3" conduit running from the building. This conduit may be used cable and telecommunication <br />utilities to the building. Provide credit to owner for the difference to run the 3" conduit to hand hole <br />versus the allotted 210'. <br />Attachments: <br />C3-100 Sketch <br />116-012 / 17C037 Page I 1 PR #003 <br />