ENGINEER'S ESTIMATE
<br />CITY OF SOUTH BEND
<br />April 17, 2012
<br />Project Name : Main Street/Lafayette Boulevard Connector
<br />Project No.: 110 -058
<br />For Bids Due : 5/22/2012
<br />BASE BID
<br />ITEM NO.
<br />DESCRIPTION
<br />CITY.
<br />UNIT
<br />UNIT PRICE
<br />TOTAL AMOUNT
<br />1
<br />DEWATERING AND PROTECTION OF EXISTING STRUCTURES
<br />1
<br />LS
<br />$5,000.00
<br />$5,000.00
<br />2
<br />CONSTRUCTION ENGINEERING
<br />1
<br />LS
<br />$94,000.00
<br />$94,000.00
<br />3
<br />CPM SCHEDULE
<br />1
<br />LS
<br />$1,250.00
<br />$1,250.00
<br />4
<br />CPM SCHEDULE, MONTHLY UPDATE
<br />13
<br />EA
<br />$200.00
<br />$2,600.00
<br />5
<br />MOBILIZATION AND DEMOBILIZATION
<br />1
<br />LS
<br />$233,000.00
<br />$233,000.00
<br />6
<br />CLEARING RIGHT -OF -WAY
<br />1
<br />LS
<br />$140,000.00
<br />$140,000.00
<br />7
<br />PIPE, REMOVE EXISTING STORM SEWER
<br />73
<br />LFT
<br />$15.00
<br />$1,095.00
<br />8
<br />PIPE, REMOVE EXISTING WATER MAIN
<br />10
<br />LFT
<br />$15.00
<br />$150.00
<br />9
<br />STRUCTURE REMOVE, EXISTING STORM MANHOLE
<br />15
<br />EACH
<br />$1,000.00
<br />$15,000.00
<br />10
<br />STRUCTURE REMOVE, EXISTING SANITARY MANHOLE
<br />2
<br />EACH
<br />$1,200.00
<br />$2,400.00
<br />11
<br />REMOVE, EXISTING CAP, 6- INCHES
<br />2
<br />EACH,
<br />$300.00
<br />$600.00
<br />12
<br />REMOVE, EXISTING CAP, 8- INCHES
<br />1
<br />EACH
<br />$350.00
<br />$350.00
<br />13
<br />REMOVE, EXISTING CAP, 10- INCHES
<br />1
<br />EACH
<br />$500.00
<br />$500.00
<br />14
<br />REMOVE, EXISTING FIRE HYDRANT
<br />2
<br />EACH
<br />$1,000.00
<br />$2,000.00
<br />15
<br />ABANDON, EXISTING STORM SEWER
<br />589
<br />LFT
<br />$20.00
<br />$11,780.00
<br />16
<br />ABANDON, EXISTING SANITARY SEWER
<br />680
<br />LFT
<br />$20.00
<br />$13,600.00
<br />17
<br />ABANDON, EXISTING SANITARY MANHOLE
<br />2
<br />EACH
<br />$1,000.00
<br />$2,000.00
<br />18
<br />ABANDON, EXISTING WATER MAIN
<br />485
<br />LFT
<br />$15.00
<br />$7,275.00
<br />19
<br />PAVEMENT REMOVAL
<br />100
<br />SYS
<br />$15.00
<br />$1,500.00
<br />20
<br />COMMON EXCAVATION
<br />35,611
<br />CYS
<br />$8.00
<br />$284,888.00
<br />21
<br />TEMPORARY EROSION AND SEDIMENT CONTROL
<br />1
<br />LS
<br />$37,000.00
<br />$37,000.00
<br />22
<br />COMPACTED AGGREGATE BASE, NO. 53, BASE
<br />9,130
<br />TON
<br />$21.00
<br />$191,730.00
<br />23
<br />COMPACTED AGGREGATE BASE, NO. 73, BASE
<br />20
<br />TON
<br />$21.00
<br />$420.00
<br />24
<br />MILLING, ASPHALT, 1 -1/2 INCH
<br />176
<br />SYS
<br />$4.00
<br />$704.00
<br />25
<br />HMA SURFACE, TYPE B
<br />1,390
<br />TON
<br />$68.00
<br />$94,520.00
<br />26
<br />HMA INTERMEDIATE, TYPE B
<br />2,280
<br />TON
<br />$64.00
<br />$145,920.00
<br />27
<br />HMA BASE, TYPE B
<br />7,290
<br />TON
<br />$53.00
<br />$386,370.00
<br />28
<br />HMA PATCHING, TYPE B
<br />260
<br />TON
<br />$100.00
<br />$26,000.00
<br />29
<br />ASPHALT FOR TACK COAT
<br />19.5
<br />SYS
<br />$1.00
<br />$19.50
<br />30
<br />PLAIN CEMENT CONCRETE PAVEMENT PATCH, 8- INCHES
<br />92
<br />SYS
<br />$45.00
<br />$4,140.00 Li
<br />Lawson- Fisher Associates P. C.
<br />Project File No. 201024.40
<br />April, 2012
<br />
|