Laserfiche WebLink
ENGINEER'S ESTIMATE <br />CITY OF SOUTH BEND <br />April 17, 2012 <br />Project Name : Main Street/Lafayette Boulevard Connector <br />Project No.: 110 -058 <br />For Bids Due : 5/22/2012 <br />BASE BID <br />ITEM NO. <br />DESCRIPTION <br />CITY. <br />UNIT <br />UNIT PRICE <br />TOTAL AMOUNT <br />1 <br />DEWATERING AND PROTECTION OF EXISTING STRUCTURES <br />1 <br />LS <br />$5,000.00 <br />$5,000.00 <br />2 <br />CONSTRUCTION ENGINEERING <br />1 <br />LS <br />$94,000.00 <br />$94,000.00 <br />3 <br />CPM SCHEDULE <br />1 <br />LS <br />$1,250.00 <br />$1,250.00 <br />4 <br />CPM SCHEDULE, MONTHLY UPDATE <br />13 <br />EA <br />$200.00 <br />$2,600.00 <br />5 <br />MOBILIZATION AND DEMOBILIZATION <br />1 <br />LS <br />$233,000.00 <br />$233,000.00 <br />6 <br />CLEARING RIGHT -OF -WAY <br />1 <br />LS <br />$140,000.00 <br />$140,000.00 <br />7 <br />PIPE, REMOVE EXISTING STORM SEWER <br />73 <br />LFT <br />$15.00 <br />$1,095.00 <br />8 <br />PIPE, REMOVE EXISTING WATER MAIN <br />10 <br />LFT <br />$15.00 <br />$150.00 <br />9 <br />STRUCTURE REMOVE, EXISTING STORM MANHOLE <br />15 <br />EACH <br />$1,000.00 <br />$15,000.00 <br />10 <br />STRUCTURE REMOVE, EXISTING SANITARY MANHOLE <br />2 <br />EACH <br />$1,200.00 <br />$2,400.00 <br />11 <br />REMOVE, EXISTING CAP, 6- INCHES <br />2 <br />EACH, <br />$300.00 <br />$600.00 <br />12 <br />REMOVE, EXISTING CAP, 8- INCHES <br />1 <br />EACH <br />$350.00 <br />$350.00 <br />13 <br />REMOVE, EXISTING CAP, 10- INCHES <br />1 <br />EACH <br />$500.00 <br />$500.00 <br />14 <br />REMOVE, EXISTING FIRE HYDRANT <br />2 <br />EACH <br />$1,000.00 <br />$2,000.00 <br />15 <br />ABANDON, EXISTING STORM SEWER <br />589 <br />LFT <br />$20.00 <br />$11,780.00 <br />16 <br />ABANDON, EXISTING SANITARY SEWER <br />680 <br />LFT <br />$20.00 <br />$13,600.00 <br />17 <br />ABANDON, EXISTING SANITARY MANHOLE <br />2 <br />EACH <br />$1,000.00 <br />$2,000.00 <br />18 <br />ABANDON, EXISTING WATER MAIN <br />485 <br />LFT <br />$15.00 <br />$7,275.00 <br />19 <br />PAVEMENT REMOVAL <br />100 <br />SYS <br />$15.00 <br />$1,500.00 <br />20 <br />COMMON EXCAVATION <br />35,611 <br />CYS <br />$8.00 <br />$284,888.00 <br />21 <br />TEMPORARY EROSION AND SEDIMENT CONTROL <br />1 <br />LS <br />$37,000.00 <br />$37,000.00 <br />22 <br />COMPACTED AGGREGATE BASE, NO. 53, BASE <br />9,130 <br />TON <br />$21.00 <br />$191,730.00 <br />23 <br />COMPACTED AGGREGATE BASE, NO. 73, BASE <br />20 <br />TON <br />$21.00 <br />$420.00 <br />24 <br />MILLING, ASPHALT, 1 -1/2 INCH <br />176 <br />SYS <br />$4.00 <br />$704.00 <br />25 <br />HMA SURFACE, TYPE B <br />1,390 <br />TON <br />$68.00 <br />$94,520.00 <br />26 <br />HMA INTERMEDIATE, TYPE B <br />2,280 <br />TON <br />$64.00 <br />$145,920.00 <br />27 <br />HMA BASE, TYPE B <br />7,290 <br />TON <br />$53.00 <br />$386,370.00 <br />28 <br />HMA PATCHING, TYPE B <br />260 <br />TON <br />$100.00 <br />$26,000.00 <br />29 <br />ASPHALT FOR TACK COAT <br />19.5 <br />SYS <br />$1.00 <br />$19.50 <br />30 <br />PLAIN CEMENT CONCRETE PAVEMENT PATCH, 8- INCHES <br />92 <br />SYS <br />$45.00 <br />$4,140.00 Li <br />Lawson- Fisher Associates P. C. <br />Project File No. 201024.40 <br />April, 2012 <br />