My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 Minutes
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
04-10-12 Packet
>
2 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 10:37:31 AM
Creation date
4/5/2012 11:42:06 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br />Regular Meeting —March 27, 2012 <br />6. NEW BUSINESS (CONT.) <br />D. South Side Development Area <br />(1) continued... <br />Golf Course area. Improvement projects like <br />the Erskine Plaza Pond project, proposed <br />improvements to the intersection of Ireland - <br />High, and the proposed Fellows- Chippewa <br />connector project all create opportunities to <br />improve the drainage and traffic circulation <br />around the course. <br />As part of both the proposed Fellows - <br />Chippewa project and the proposed Ireland - <br />High intersection project,, there are <br />opportunities to improve surface and <br />overflow drainage that flows into the golf <br />course area and reduce course flooding and <br />damage as well as reduce the drainage <br />feature costs associated with both of the <br />proposed infrastructure projects. The <br />opportunity to develop connected pond <br />systems on the course can reduce the costs <br />associated with pipe work and storm line <br />constraints on the south side storm water <br />network. <br />The attached proposal contemplates survey <br />services in two formats: <br />Option 1. Survey services via aerial <br />photography - $18,769 <br />Option 2. Survey services via land <br />based survey - $21,016 <br />Staff would request approval of a budget cap <br />of $22,000 for survey services with an <br />overage allowance for Option 2 based on <br />estimated costs for potential overage costs <br />based on the amount of area to be surveyed. <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.