My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - DLZ Indiana LLC - Design Services for Pinhook Park Improvements Project
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - DLZ Indiana LLC - Design Services for Pinhook Park Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:21:08 AM
Creation date
11/14/2018 1:11:44 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8. Reviewing a Shop Drawing more than three times, as a result of repeated inadequate <br />submissions by Contractor. <br />9. While at the Project site, compliance by Engineer and its staff with those terms of Owner's <br />or Contractor's safety program provided to Engineer subsequent to the Effective Date that <br />exceed those normally required of engineering personnel by federal, state, or local safety <br />authorities for similar construction sites. <br />Page 8 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright K) 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.