My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - Edison Production Well #2A Rehabilitation Project No 118-103 - Peerless Midwest Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Quotations - Edison Production Well #2A Rehabilitation Project No 118-103 - Peerless Midwest Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 9:08:18 AM
Creation date
11/14/2018 12:59:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 <br />NATIONALPUMP 7706 North 715t Avenue <br />Glendale, AZ 85303 <br />COMPANY (623) 979-3560 voice <br />A GORMAN-RUPP COMPANY (623) 979-2177 fax <br />2018.11.12 <br />Re: Testing per ANSI/HI 14.6 <br />National Pump Company operates three test laboratory facilities in Glendale, AZ, Lubbock, TX, and Olive <br />Branch MS. Each test facility is capable of performing testing in accordance with ANSI/HI 14.6 <br />"Rotodynamic Pumps for Hydraulic Performance Acceptance Tests." This testing can be done to the most <br />stringent level, grade 1 including 1 B, 1 E and 1 U pump test acceptance grades. <br />National Pump Company's standard published performance curves are guaranteed to a 1 B performance <br />acceptance grade. When a 1 E or 1 U performance acceptance grade is required, please contact National <br />Pump Company to obtain a curve corrected for that guaranteed performance grade. <br />Sincerely, <br />A. Bruce Ticknor III, P.E. <br />Director of Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.