Laserfiche WebLink
CITY OF SOUTH BEND -T�J <br />School Zone Flashing Beacons at 39 Schools Safety Improvements (Des. 1801240). <br />0III"' '',,, III sou 'll III Y BUlnIIINHI) I IIIIP'14COIlf lll'"4 '`9;u <br />^III IC111 f. III°°IIIIP Uhl; %,III' Ul °a ia�`dall ��UA III'b(U`f' °e"g lll' III;';;J�au� r4 III <br />III„�� ° y �,°y� � °;;nJU,,,,,,lll 0 0 Ill,,,, D III ;U; S U! G III' v <br />This project included the complete design services for retro-fitting <br />sidewalks and curb ramps into a built-up environment. The existing <br />sidewalks and curb ramps were deteriorated and not in compliance <br />with ADA standards. Design services included topographic survey, <br />environmental document, and the design of sidewalk and 123 curb <br />ramps for Lincoln Primary and 98 curb ramps for Perley Fine Arts <br />Academy. <br />Many of the sidewalk and curb ramp design locations required <br />unique design solutions to allow the ramp to be designed within the <br />ADA guidelines, while negating the need for additional right-of-way <br />or any utility relocations. Both locations were ultimately constructed <br />under budget. <br />07 Y °`;F- St III V%C)O Ul , & <br />UI )„A S I� U UI°", UI UI'4 S U U Cl U 0 U'°Jl <br />III III PIi ° III a UI III r Pd „ 14,00580) II Uf III <br />1,400934) <br />For Phase II, VS provided construction inspection services for the <br />installation of 240 School Zone 25 MPH Flashers installed at various <br />locations throughout the City of Indianapolis. <br />For Phase III, VS is provided construction inspection services for the <br />installation of approximately 112 School Zone 25 MPH Flashers installed <br />and 518 modem retrofits, including Phase I, at various locations. <br />Key components of the installations included field adjustments as <br />necessary to avoid utilities, existing driveways and line of sight issues, all <br />while ensuring the flashers were placed in accordance with City standards. <br />Additionally, impacts to adjacent properties and/or concerns of residents <br />nearby were coordinated with the Contractor and Indianapolis DPW staff <br />to make certain the final location of each flasher was satisfactory to all <br />stakeholders. VS Project Supervisor also enforced standard maintenance of <br />traffic procedures as the safety of pedestrians and motorists in high traffic <br />volume areas around each school was critical. <br />SIMILAR PROJECTS * 11 <br />