Project: <br />Erskine Clubhouse Renovation <br />South Bend Project # 116-108 <br />To Contractor: <br />Ziolkowski Construction, Inc. <br />4050 Ralph Jones Drive <br />South Bend, IN 46628 <br />CHANGE ORDER <br />Change Order Number <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />Date: <br />Contract Date: <br />Contract For: <br />2 <br />November 1, 2018 <br />August 28, 2018 <br />General Construction <br />Per attached RCO #001 Deduct $720.00 for providing and installing GacoFlex coating in lieu <br />of EPDM in existing gutters per RFI #009 <br />Per attached RCO #002 Add $851.00 to Furnish and install pipe and fittings required to tie <br />one (1) downspout into the proposed Storm Sewer System per RFI #007 <br />Per attached RCO #004 Add $1,808.00 for labor and material to camera and GPS the <br />location of the existing sanitary lines in the basement per RFI #016 response #1 <br />Per attached RCO #005 Add $5,960.00 for labor, material and equipment to install one (1) <br />backflow preventer <br />The Original Contract Sum is <br />The net change by previously authorized Change Orders <br />The Contract Sum prior to this Change Order was: <br />The Contract Sum will be increased by this Change Order in the amount of: <br />The new Contract Sum including this Change Order will be: <br />The Contract Time will be changed by ZERO days <br />The date of Substantial Completion as of the date of this Change Order therefore is <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER <br />Architect: <br />Kg, 1126 Lincolnway East, South Bend, IN 46601 <br />d <br />By: )Groipt " . 111, NCARB, AIA Architect <br />By: Date: <br />Owner: <br />By: Date: <br />$ 907,000 <br />$ 0 <br />$ 907,000 <br />$ 7,899 <br />$ 914,899 <br />March 22, 2019 <br />K I L <br />ARCHITECTURE <br />PLANNING <br />1126 LINCOLNWAY EAST SOUTH BEND IN 46601 (574) 288. 2654 VOICE 289 2420 FAX <br />