My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 and 2 - Erskine Clubhouse Renovation Project No 116-108 - Ziolkowski Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Change Orders
>
Change Order No 1 and 2 - Erskine Clubhouse Renovation Project No 116-108 - Ziolkowski Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 1:43:38 PM
Creation date
11/14/2018 12:38:56 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ZIOLK0 SKI <br />Constwuellon, inc. <br />General Construction & Design/Build <br />Building Strong Relationships Since 1974 <br />REQUEST FOR INFORMATION <br />Erskine Clubhouse Renovations <br />Ziolkowski Construction Project No: 17668 <br />City's Project No: 116-108 <br />Subcontractor: 1I Spec Section: Reference Attachments <br />E —White"""— P L I — RFI 005 <br />Information Requested: <br />1. Sanitary sewer lines: Shown on pg. P1.1 entering building at east wall but not <br />connecting to the lift station on the east side of the building. Contractor is not sure <br />where existing SS lines. <br />2. Kitchen SS line currently wraps past fireplace through men's restroom and down <br />under porch. Contractor believes they need to be removed in -order to tie into <br />proposed SS line according to 4" main on pg. P1.1. They suggest the removal of <br />overhead piping and dropping new line against wall in the corner next to the fireplace <br />and connecting the line under the slab. (Ref. - RFI 005) <br />Possible Solution: <br />They suggest the removal of overhead piping and dropping new line against wall in <br />corner next to fireplace and connecting the line under the slab. (Ref. - RFI 005) <br />)reuse: <br />no uct <br />The 4ith �:'��!nt of ..�' ��� u uhu � a� t a u.au Mth���r o iew <br />.� ., the 4.h4.,�ng �� a �d� tee ua�lhd � hh u�l � � ii ��nu u�", h <br />flI ]: S U:flJor Il t. q u.,u h u e d. �I ii-o cd iI a 11,n era a n d h G h.. k s II ot. a to o. sa II IJ II II all.y II Ines. <br />.h \Ne gad ll"P;;!e vM:h Ul 1I4AOn �d iuhd::dh ii:fl'l (iiiauuu allcdwq w aNll in c::d:wtu u,. <br />hmll�1161Dhac d td:iiii connect � � y u � e! Mthli thus <br />'h': II.,VII"�a'.hu�Il hhd;��Na '�h�:t:li h hd"'�i;;t'.�4� ry�p�I�?'IIa�'1� �NI1i+ cost 0."h1��u"1'„ <br />pup �II,dll.u;du ud:;h.°i, <br />Requested By: Tim Morey Answered By <br />Response Needed Bv: ASAP Date Answered: <br />CC: File <br />RFI Log <br />Greg Kil - Architect <br />Alicia Czarnecki - Owner <br />Site Supervisor — Tim Koziel <br />4050 F� N _Jones [give, ouch S� r�m�.,..IN 4 n 8 Phone <br />omtn"iited to professionalism and excellence for the benefit of our clients, employees, and shareholders. <br />
The URL can be used to link to this page
Your browser does not support the video tag.