My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Three Twenty at the Cascade Glazed Assemblies Project No 118-074A - Precision Wall Systems Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Three Twenty at the Cascade Glazed Assemblies Project No 118-074A - Precision Wall Systems Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 1:20:29 PM
Creation date
10/25/2018 9:17:51 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/23/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Specific Inclusions, Exclusions, Terms and Conditions <br />General <br />• Sales Tax is EXCLUDED. <br />• Protection of our work (installed or stored) on site is EXCLUDED. <br />• Final cleaning is included. <br />• We have assumed embed layout is correct and embeds are sized appropriately, <br />• We have assumed payment for stored materials, <br />• We have assumed structure is capable of handling loads imposed by our systems. <br />• We require minimum 15' clear access at perimeter of our work, <br />• Glass breakage as a warranty itern is excluded. <br />• If required, performance and payment bond is in effect for one (1) year from substantial completion, <br />Section 084313 - Aluminum -Framed Storefronts <br />• We have included approximately 2,250 SF of 2" x 4-1/2" thermally -broken aluminum storefront framing, <br />• Manual aluminum entrance doors are included as standard (non -thermal) wide stile. <br />• Finish for all aluminum framing and entrances under this section is painted in lieu of anodized. <br />• Hardware for aluminum doors is included (von duprin panics, LCN 4040 closers, continuous hinges). <br />• Glass for this section is included as specified. <br />• Perimeter caulking of our work is included (2 lines). <br />• We have included break metal sill flashing but not as shown in detail 2/A30'2. <br />• Blocking and structural studs will be required (by others) at head of storefront for attachment. <br />• Interface with EIFS and other substrates needs to be reviewed to insure continuity of weather barrier. <br />Section 084413.10 -Glazed Aluminum Curtain Wall (Ribbon Window) <br />• Approximately 17,700 SF of PWS 6525UW curtain wall is included as pail of this proposal. <br />• We have included 20 thermal terrace doors for balconies. <br />• Approximately 70 zero-sightline vents are included where noted in floor plans. <br />• Finish for all training, doors and vents is painted (silver/gray color to mimic clear anodized). <br />• Curtain wall framing members will be painted with an acrylic paint. <br />• Exterior curtain wall components, terrace doors and vents will have kynar paint. <br />• We have included a curtain wall approach in lieu of ribbon window approach. Framing will "fly" <br />past slabs from level 2 through level 7. Top of slab anchors will be attached to existing embed <br />anchors. Stool trim will be utilized to cover top of slab anchors. <br />• An insulated metal panel will be used at slab -edge "spandrel" location to mirnic current design. <br />• Fire-safing and insulation will be required and is included as part of this, proposal. <br />• EIFS transitions will need to be addressed. <br />• Vision glass is included. Specifications seem to be written backwards. Inboard lite should be clear. <br />• We assume the embed layout correct and will perform a survey after award to confirm. If the embeds <br />are not located correctly additional cost and time may be required to develop a solution. <br />• We have included perimeter caulking (2 lines) of our work only. <br />• Interface with EIFS and other substrates needs to be reviewed to insure continuity of weather barrier, <br />• Detail I /A501 needs to be reviewed and corrected to create a continuous vapor barrier. <br />Section 088000 - Glazing <br />• We have included insulated glazing by a specified manufacturer, <br />• Glass makeup in spec seems to be backwards. We assumed tinted lite should be outboard. <br />• We have included black warm -edge spacers and argon fill. <br />• Glass warranties are manufacturer standard. <br />Proposed by - Jason Christy Accepted by - <br />Mobile - 574.210.9'643 Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.