My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Lafayette Bldg Exterior Renovation - Project No 117-100R - C&S Masonry Restoration LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Lafayette Bldg Exterior Renovation - Project No 117-100R - C&S Masonry Restoration LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 3:22:45 PM
Creation date
10/10/2018 3:10:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/9/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Lafayette Building Exterior Renovation <br />South Bend, Indiana <br />SECTION 07 1900 - WATER REPELLENTS <br />PART 1 GENERAL <br />Copyright, Kil Architecture / Planning <br />October, 2018 <br />1.1 SECTION INCLUDES <br />A. Water repellents applied to exterior, masonry, stone, and concrete surfaces, <br />L2 <br />A <br />1.3 <br />1.4 <br />A. <br />B. <br />C. <br />D. <br />E. <br />P, <br />G <br />RELATED REQUIREMENTS <br />Section 04 0100 Maintenance of Masonry. <br />REFERENCE STANDARDS <br />SUBMITTALS <br />See Section 013000 - Administrative Requirements, for submittal procedures. <br />Product Data: Provide product description. <br />Manufacturer's Installation Instructions: Indicate special procedures and conditions requiring <br />special attention; cautionary procedures required during application. <br />Manufacturer's Certificate: Certify that products meet or exceed specified requirements. <br />Manufacturer's Field Reports: Report whether manufacturer's "best practices" are being <br />followed; if not, state corrective recommendations. Email report to Architect the same day as <br />inspection occurs; mail report on manufacturer's letterhead to Architect within 2 days after <br />inspection. <br />Manufacturer's Qualification Statement, <br />Installer's Qualification Statement. <br />1.5 QUALITY ASSURANCE <br />A. Manufacturer Qualifications: Company specializing in manufacturing products specified in <br />this section, with not less than three years documented experience. <br />B. Installer Qualifications: Company specializing in performing work of type specified and with <br />at least three years of documented experience <br />L6 MOCK-UP <br />A. Prepare a representative surface 36 inch by 36 inch in size using specified materials and <br />preparation and application methods on surfaces identical to those to be coated; approved <br />rrrock-up constitutes standard for workmanship. <br />WATER REPELLENTS 07 E 900 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.