My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - WWTP Bank Stabilization Phase 2 - C&E Excavating Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Quotes - WWTP Bank Stabilization Phase 2 - C&E Excavating Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 9:46:10 AM
Creation date
9/27/2018 10:36:46 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/25/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA <br />CORI�R-ALOT-W-$-�Q-VQTE--EORP'LiBLIQMORK <br />11165 <br />PROJECTNAME: Wastewater Treatment Plant Bank Stabilization Phase'.2 <br />PROJECT <br />— --------- <br />QUOTES DUE September 25, 20,18 <br />(Mast be completed for all qUotes. Please type or print) <br />Date: 9/25/18 Firm: C & E Excavating Inc_----------- ----- . .... ......... .. ..... <br />Address: 63767 County Road 9 <br />City/State/Zip: Elkhart, IN 46514 Telephone Number, (_6741-)_ 262-431,461- <br />Agent of Bidder (if Applicable): Thad "- B - ess, , ing " er , <br />Pursuant to notices given, the Undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of <br />Wastewater Treatment Plant Bank Stabilization Phase 2 <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City ,ol,f,,,S-oLit,hMend, "D,part,me,t,i,t of Public Works & Card no <br />and dated 9/4/18 for the sum of (enter the Total Quote as shown oil the Proposal) <br />One hundred ininety-nine thousand, four hundred ninety-nine dollars, and no/100 ($ <br />, Enter Sum of Total Quote plus ,Alternates I shown on I Proposal) I 11 I I (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendurns attached will be specifically referenced at the applicable page, <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. It the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment <br />By <br />I t IL'riB 71g n'Tt <br />Thad Bessing,er, President <br />(Printed Name of Person Signing) <br />The above quote is accepted this <br />Subject to the following conditions', <br />BOARD OF PUBLIC WORKS <br />Gary A, GOot, President <br />Elizabeth A, Maradik, Mernber <br />I fames A. Mueller, Member <br />ACCEPTANCE <br />day of <br />SLIzanna M, Fritzberg, Mernber <br />Therese J, Dorau, Mernber <br />Attest: Linda A Martin, Clark <br />M <br />Version 10/18/201133 (",age - 7 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.