Laserfiche WebLink
The Amendment includes the addition of Building #3 (Primary Building) to the scope of work <br />which is one of the buildings with extensive lintel displacement, masonry joint failure and lintel <br />deterioration. Building #3 houses a SCADA control station computer, variable frequency drives <br />for two Primary Pumps, and Pakscan equipment for the complex valve network for the eight <br />Primary Clarifiers. <br />The funding sources for these improvements shall be directed from funding sources identified by <br />Division of Utilities Wastewater Engineering Accounts (641-0630-793-31-02) and other <br />Wastewater Accounts as appropriate. If there are questions regarding the subject project, <br />please contact Al Greek (Ext. 4210) or Jacob M. Klosinski (Ext. 9496) at the Division of Utilities. <br />