My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Confirming Tax Abatement - 1215 S. Walnut St. - Lock Joint Tube, LLC
sbend
>
Public
>
Common Council
>
Legislation
>
Resolutions/Special Resolutions
>
2006
>
Confirming Tax Abatement - 1215 S. Walnut St. - Lock Joint Tube, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2008 9:36:21 AM
Creation date
1/11/2008 8:31:01 AM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Resolutions
City Counci - Date
8/14/2006
Ord-Res Number
3621-06
Bill Number
06-76
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND PETITION FOR <br />TANGIBLE PERSONAL PROPERTY TAX ABATEMENT CONSIDERATION <br />The undersigned owner(s) of new manufacturing equipment, personal property, located <br />within the City of South Bend, hereby petitions the Common Council of the City of South Bend for <br />personal property (new manufacturing equipment) tax abatement consideration and pursuant to I.C. <br />6-1.1-12. 1-1 et sec ., and South Bend Municipal Code Section 2-84.2 et sec ., for this petition states <br />the following: <br />Describe the proposed project, including information about the new manufacturing <br />equipment personal property ("equipment") to be installed, the amount of land to be used, if <br />any, the proposed use of the equipment, and a general statement as to the value of the project <br />to your business. <br />This proposed project consists of the acquisition and installation of new machinery and <br />equipment, including without limitation, milling and fabricating equipment for use in Lock <br />Joint Tube, LLC's Walnut Street facility in South Bend. This equipment will increase the <br />efficiency and accurac~of precision milling and fabrication as well as reduce scrap steel in <br />the Company's operations. The entire cost for this proposed project is estimated to be <br />between $2,200,000 and $3,200,000. Investment in this new equipment will support the <br />Company's ability to cut and fabricate heavier Qauge steel, with more precision, thereby <br />enhancing our position within a very competitive industry <br />2. The project will create at least 0 new, permanent, jobs within the first year, representing a <br />new annual payroll of at least N/A and will maintain 42 existing permanentfull-time and <br />0 existing part-time jobs with an annual payroll of $_1,352,000` (Walnut Street). The <br />projected annual salaries for each position are as follows: N/A <br />3. Estimate the cost of the Equipment: Lock Joint Tube, LLC estimates the cost of the new <br />equipment will be between $2.2 and $3.2 million. <br />4. (a) The Equipment is owned or to be owned by the following individuals or corporations <br />(if the business organization ispublicly-held, indicate also the name of the corporate <br />parent, if any, and the name under which the corporation has filed with the Securities <br />and Exchange Commission): <br />NAME ADDRESS INTEREST <br />Lock Joint Tube, LLC 515 W. Ireland Road Owner <br />South Bend, Indiana 46614 <br />
The URL can be used to link to this page
Your browser does not support the video tag.