My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - JC Lauber Site Improvements Proj No 118-083B - Indiana Earth Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - JC Lauber Site Improvements Proj No 118-083B - Indiana Earth Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 3:14:50 PM
Creation date
9/20/2018 3:16:08 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/20/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INDIANA EARTH, INC. <br />10343 MCKINLEY HWY <br />OSCEOLA, IN 46561 <br />Section 1 <br />Public Projects completed: <br />1) Excavation & Utility —St Marys College, South Bend, IN $900,000 Fall 2017 <br />2) Northwood High School Phase B — Nappanee, IN $168,900 Fall 2017 <br />3) Excavation & Utility CR 38 — City of Goshen, IN $2,491,277 Spring 2018 <br />4) Utility— Nappanee WWTP, Nappanee, IN $519,020 Summer 2017 <br />Public Works in Process: <br />1) <br />Northwood High School Athletic Center, Nappanee, IN <br />$1,233,500 Fall 2018 <br />2) <br />Excavation and Utility— Laporte Intermediate School <br />$1,531,400 Fail 2017 <br />3) <br />Excavation and Utility -- Concord High School <br />$451,100 Summer 2018 <br />4) <br />Excavation and Utility — Warsaw High School <br />$612,400 Summer 2018 <br />5) <br />Excavation and Utility— Penn High School <br />$219,400 Summer 2018 <br />Completed all work awarded to our firm. <br />References of Private Firms <br />1) <br />Rieth Riley Construction <br />574-288-8321 <br />2) <br />Gibson Lewis LLC <br />574-259-8581 <br />3) <br />Larson Danielson <br />219-362-2127 <br />4) <br />Holladay Group <br />574-234-2073 <br />5) <br />Robert Henry Const. <br />574-232-2091 <br />Section 2 <br />Plan of proposed work <br />1) Pre -construction meeting <br />2) Mobilization <br />3) Strip topsoil <br />4) Removals <br />5) Place barricades <br />6) Install underground utilitys <br />7) Earthwork <br />8) Place curbs <br />9) Place stone <br />10) Place pavement <br />11) Place sidewalks and pavers <br />12) Landscaping <br />13) Pavement markings <br />
The URL can be used to link to this page
Your browser does not support the video tag.