<br />Project Name Lincoln Way East (SR 933) Corridor Improvements — Sample Street to
<br />Twyckenharn Drive
<br />Project No. 117-055A
<br />For Bids Due September 61h, 2018
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />I
<br />CONSTRUCTION ENGINEERING
<br />1
<br />LS
<br />8,,700.00
<br />$8,700.00
<br />2
<br />MOBILIZATION AND DEMOBILIZATION
<br />1
<br />LS
<br />21,905.69
<br />$21,905.69
<br />3
<br />CLEARING RIGHT OF WAY
<br />1
<br />LS
<br />14,7100.00
<br />$14,700.00
<br />4
<br />PAVEMENT REMOVAL
<br />1723
<br />SYS
<br />12.40
<br />$21,365.20
<br />5
<br />CURB, CONCRETE, REMOVE
<br />3875
<br />LFT
<br />5.00
<br />$19,375.010
<br />6
<br />SIDEWALK CONCRETE, REMOVE
<br />Ill 15
<br />SYS
<br />20,80
<br />$2,392.00
<br />7
<br />INLET, REMOVE
<br />7
<br />EACH
<br />280.00
<br />$1,960,00
<br />8
<br />COMMON EXCAVATION
<br />250
<br />CYS
<br />45,.,00
<br />$11,250.00
<br />9
<br />DESIGN BLJIILD EROSION AND SEDIMENT
<br />CONTROL
<br />I
<br />LSUM
<br />900.00
<br />$,900.00
<br />10
<br />1'II. .WIORARY SILT FENCE, k IN[)ISTRIIBUTEJ[")
<br />500
<br />LF1
<br />3,00
<br />$1,5010m
<br />11
<br />B BORROW 11 ( RROW
<br />860,
<br />CYS
<br />33.60
<br />$28,896,00
<br />12
<br />PCCP PATCHING, FULL DEPTH
<br />200
<br />SYS
<br />1:136,80
<br />$27,360.00
<br />13
<br />!GUARDRAIL, REMOVE
<br />3023
<br />LFT
<br />3.00
<br />$9,069.00
<br />14
<br />J
<br />�GUARDRAIL, W-BEAM, NESTED, MODIFIED
<br />I
<br />EACH
<br />3,7010.00
<br />$3,700.00
<br />—1
<br />15
<br />GUARDRAIL, W-BEAM, MODIFIED, 6 FT 3 IN
<br />POST SPACING
<br />2450
<br />LIFT
<br />29.00
<br />$71,050.00
<br />16
<br />IGUARDRAIL, END TREATMENT, OS
<br />7
<br />EACH
<br />3,3010.00
<br />$23,100.00
<br />17
<br />SIDEWALK, CONCRETE, 4"
<br />280
<br />SYS
<br />4180
<br />$12,264.00
<br />18
<br />SIDEWALK, CONCRETE, 6"
<br />28
<br />SYS
<br />65.50
<br />$1,834.00
<br />19
<br />CURB RAMP, CONCRETE
<br />33.5
<br />SYS
<br />65,50
<br />$2,194.25
<br />20
<br />CURB, CONCRETEE
<br />921
<br />LFT
<br />19.70
<br />$18,143.70
<br />21
<br />CURB, CONCRETE, B
<br />2954
<br />LFT
<br />17.10
<br />$50,513.40
<br />22
<br />PCCP FOR APPROACHES, 8 IN
<br />81.8
<br />SYS
<br />90.010
<br />$7,362.00
<br />23
<br />MULCHING MATERIAL
<br />1.5
<br />TON
<br />3,206.67
<br />$4,810.01
<br />24
<br />SEED MIXTURE, R
<br />310
<br />LBS
<br />17.34
<br />$5,375A0
<br />25
<br />SODDING, UNDISTIBUTED
<br />100
<br />SYS
<br />51.13
<br />$5,11100
<br />26
<br />PIPE, CONNECT TO EXISTING
<br />6
<br />EACH
<br />700.00
<br />$4,200.00