Laserfiche WebLink
".4 <br />Project Name Lincoln Way East (SR 933) Corridor Improvements — Sample Street to <br />Twyckenharn Drive <br />Project No. 117-055A <br />For Bids Due September 61h, 2018 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />I <br />CONSTRUCTION ENGINEERING <br />1 <br />LS <br />8,,700.00 <br />$8,700.00 <br />2 <br />MOBILIZATION AND DEMOBILIZATION <br />1 <br />LS <br />21,905.69 <br />$21,905.69 <br />3 <br />CLEARING RIGHT OF WAY <br />1 <br />LS <br />14,7100.00 <br />$14,700.00 <br />4 <br />PAVEMENT REMOVAL <br />1723 <br />SYS <br />12.40 <br />$21,365.20 <br />5 <br />CURB, CONCRETE, REMOVE <br />3875 <br />LFT <br />5.00 <br />$19,375.010 <br />6 <br />SIDEWALK CONCRETE, REMOVE <br />Ill 15 <br />SYS <br />20,80 <br />$2,392.00 <br />7 <br />INLET, REMOVE <br />7 <br />EACH <br />280.00 <br />$1,960,00 <br />8 <br />COMMON EXCAVATION <br />250 <br />CYS <br />45,.,00 <br />$11,250.00 <br />9 <br />DESIGN BLJIILD EROSION AND SEDIMENT <br />CONTROL <br />I <br />LSUM <br />900.00 <br />$,900.00 <br />10 <br />1'II. .WIORARY SILT FENCE, k IN[)ISTRIIBUTEJ[") <br />500 <br />LF1 <br />3,00 <br />$1,5010m <br />11 <br />B BORROW 11 ( RROW <br />860, <br />CYS <br />33.60 <br />$28,896,00 <br />12 <br />PCCP PATCHING, FULL DEPTH <br />200 <br />SYS <br />1:136,80 <br />$27,360.00 <br />13 <br />!GUARDRAIL, REMOVE <br />3023 <br />LFT <br />3.00 <br />$9,069.00 <br />14 <br />J <br />�GUARDRAIL, W-BEAM, NESTED, MODIFIED <br />I <br />EACH <br />3,7010.00 <br />$3,700.00 <br />—1 <br />15 <br />GUARDRAIL, W-BEAM, MODIFIED, 6 FT 3 IN <br />POST SPACING <br />2450 <br />LIFT <br />29.00 <br />$71,050.00 <br />16 <br />IGUARDRAIL, END TREATMENT, OS <br />7 <br />EACH <br />3,3010.00 <br />$23,100.00 <br />17 <br />SIDEWALK, CONCRETE, 4" <br />280 <br />SYS <br />4180 <br />$12,264.00 <br />18 <br />SIDEWALK, CONCRETE, 6" <br />28 <br />SYS <br />65.50 <br />$1,834.00 <br />19 <br />CURB RAMP, CONCRETE <br />33.5 <br />SYS <br />65,50 <br />$2,194.25 <br />20 <br />CURB, CONCRETEE <br />921 <br />LFT <br />19.70 <br />$18,143.70 <br />21 <br />CURB, CONCRETE, B <br />2954 <br />LFT <br />17.10 <br />$50,513.40 <br />22 <br />PCCP FOR APPROACHES, 8 IN <br />81.8 <br />SYS <br />90.010 <br />$7,362.00 <br />23 <br />MULCHING MATERIAL <br />1.5 <br />TON <br />3,206.67 <br />$4,810.01 <br />24 <br />SEED MIXTURE, R <br />310 <br />LBS <br />17.34 <br />$5,375A0 <br />25 <br />SODDING, UNDISTIBUTED <br />100 <br />SYS <br />51.13 <br />$5,11100 <br />26 <br />PIPE, CONNECT TO EXISTING <br />6 <br />EACH <br />700.00 <br />$4,200.00 <br />