My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Lincoln Way East Corridor Improvements Proj No 117-055A - Rieth Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Lincoln Way East Corridor Improvements Proj No 117-055A - Rieth Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 11:08:32 AM
Creation date
9/6/2018 12:06:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/6/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND <br />lay' l <br />MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY <br />WA <br />DEVELOPMENT PROGRAM <br />FORM MWBE-2.0 <br />v te�, <br />;�w <br />EVIDENCE OF GOOD FAITH EFFORTS, <br />This completed form should be Included as part of the Bids documents related to City of South Bend Public <br />Works Projects requiring Good Faith Efforts to obtain MBEIWBE participation. It is the bidder's sole <br />responsibility to verify whether any listed' minority or woman business meats the qualifications of a Minority <br />or Women's owned business as definedby the Indiana Department of Administration ("IDOA"). <br />Project Number: 117-065A Date: <br />Lincoln Way East (SR 933) Corridor Improvements — Sample Street To <br />Project Name: TLNyckenham Drive <br />Bidder. Rieth-Riley Construction CO., Inc. <br />Contact Person: Johsua A. McCormick Telephone: 574-28,8-8321 <br />Address: 25200 State Road 23 <br />City: South Bend state: Indiana Zip: 46614 <br />Email: jmccormick@rieth,-riley.com <br />To determine whether a bidder has demonstrated good faith efforts to reach the MBEJWBE utilization goals set <br />forth in the City of South Bend Public Works Project Specifications, the City and Its agencies, boards, or <br />commissions, REQUIRE ALL of the followings Good Faith Efforts as listed In the table below*: <br />EVIDENCE OF GOOD FAITH EFFORTS <br />MBEIW13E LIST(S); The bidder reviewed the City of South Bend's Minority and Women Business <br />Enterprise Diversity Development Program, which, uses the IDOA approved list of Minority and Women <br />X <br />Owned Business as found on their website (http:/Mww, In, gov/idoa), <br />ACTION (ADVERTISEICONTACT): In order for your bid to be deemed responsive, the City of South <br />Ban quires that all perspective bidders complete no less than 2 of the following; <br />1. Attend all pre -bid meetings scheduled by the City to inform MBEANBEs of contracting and <br />opportunities. <br />( ?")subcontracting <br />Advertise in general circulation andlor trade association publications concerning subcontracting <br />opportunities, and allow MBEIWBEs reasonable time to respond, <br />"-/to <br />(,Perform any and all necessary steps to provide written notice in a manner reasonably calculated <br />inform MOENVBEs of subcontracting opportunities and allowed sufficient time for them to <br />participate effectively, <br />4. Utilize pre-existing services of available rcommunity organizations, small and/or disadvantaged <br />business assistance offices and other organizations that provided assistance in the recruitment <br />and placement of MBEANBE firms, <br />X <br />"Bidder must circle or otherwise notate which of the two (2) required actions were performed. <br />GOOD FAITH NEGOTIATIONS: The bidder negotiated In good faith with Interested' MBE/WBEs, <br />including providing such MBE/WBE's with adequate information about the plains, specifications and other <br />requirements of the subcontract and did not reject MBENVBEs as unqualified without sound business <br />X <br />reasons based on a thorough investigation, of their capabilities. <br />SMALL CONTRACT(S)., The bidder selected specific portions of the work to be performed by <br />MBENVBEs in order to increase the likelihood of meeting the MBEANBE goals (including breaking down <br />contracts into smaller units to facilitate MBEJWBE participation) <br />RECORDS: The bidder has maintained the following records for each MBEIWBE that has <br />bCONTRACT <br />id on the subcontracting opportunity, <br />1. Name, address, and teiaphono number', <br />2, A description of information provided by the bidder or subcontractor; and <br />3. A statement of whether an agreement was reached, and If not, why not, Including any reasons for <br />X <br />concluding that the MBENVOE was unqualified to perform the job, <br />*Proper demonstration of Good Faith 'Effort requires your Initials next to all of the above boxes. Any <br />omissions shall be considered grounds for rejection of the bid by the Board of Public Works, The City of <br />South Bond reserves the right to request additional Information, <br />Version 7t2M2018 Contractor's Bid for Public Works - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.