My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - DLZ Indiana LLC - Century Center Floor Slab Repair Design
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - DLZ Indiana LLC - Century Center Floor Slab Repair Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:20:21 AM
Creation date
8/30/2018 9:45:41 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/28/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is Exhibit C, consisting of 3 pages, <br />referred to in and part of the Short Form <br />of Agreement between Owner and <br />Architect/Engineer for Professional <br />Services dated August 28, 2018. <br />Payment to Architect/Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services — Lump Sum and Standard <br />Hourlv Rates <br />Article 2 of the Agreement is supplemented to include the following agreement of the <br />parties: <br />ARTICLE 2 — OWNER'S RESPONSIBILITIES <br />C1.01 Compensation for Basic Services (other than Resident Project Representative) - <br />Lump Sun? and Standard Hourly Rates Method of Payment <br />A. Owner shall pay Architect/Engineer for Basic Services set forth in Exhibit A, <br />except for services of Architect/Engineer's Resident Representative, if any, as <br />fOlIoYVS: <br />Item <br />Description <br />Amount <br />Type <br />a. <br />Damage Inspection and Report <br />$10,500.00 <br />Lump Sum <br />b. <br />Coordination With Insurance Company <br />$1,000.00 <br />Hourly Rate <br />Total <br />$11,500.00 <br />1. Architect/Engineer may alter the distribution of compensation between <br />individual phases noted herein to be consistent with services actually <br />rendered, but shall not exceed the total Lump Sum amount unless approved <br />in writing by the Owner. <br />2. The Lump Sum includes compensation for Architect/Engineer's services <br />and services of Architect/Engineer's Consultants, if any, Appropriate <br />amounts have been incorporated in the Lump Sum to account for labor, <br />overhead, profit, and Reimbursable Expenses. <br />Exhibit C - Page 1 <br />EJCDC E-500 Agreement Between owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.