My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Arcadis US Inc - Rehab of Raw Sewage Pump No 2
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Arcadis US Inc - Rehab of Raw Sewage Pump No 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:11:56 AM
Creation date
8/30/2018 9:43:08 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/28/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Kick-off and Design Review Meetings. Meet with Client to Dick -off the project including a site <br />visit to perform field investigations. Meet with the client to review deliverables and design progress <br />for 90% design (conference call). In addition to these meetings, up to two conference calls are <br />included to share progress and resolve outstanding items. <br />3. Pump Evaluation. Gather information on the pump as part of the site visit. In addition, review the <br />inspection report by Power Plant Services Corporation and confirm that rebuilding the pump is a cost- <br />effective solution that provides the required capacity and reliability. Obtain information on the existing <br />motor and consult with the motor manufacturer to ensure compatibility with the rebuilt pump. <br />Summarize results in a brief memorandum. <br />4. Construction Drawings. Prepare construction drawings to show the general scope, extent and <br />character of the work to be furnished and performed by Contractor. Two 11 "x 17" drawings are <br />anticipated and will be bound in the Project Manual. <br />5. Project Manual. Prepare a Project Manual to include invitation to bidders, instructions to bidders, <br />bid form, form of agreement, bond forms, general conditions and supplementary conditions (all of <br />which shall be consistent with the forms and pertinent guide sheets prepared by the Engineers Joint <br />Contract Documents Committee), and Specifications (which will be prepared in conformance with <br />the 50-division format of the Construction Specifications Institute). <br />G. Opinion of Construction Costs. Prepare engineer's opinions of probable construction costs for <br />each deliverable, <br />7. Construction Schedule. Prepare construction schedule establishing advertisement dates, bid opening, <br />notice -to -proceed, and critical construction milestone dates for each deliverable. <br />8. Bid Assistance. Assist Client in advertising for bids. Provide ARC Reprographics with Bidding <br />Documents for their distribution to plan holders. ARC Reprographics will distribute the documents <br />and maintain a record of plan holders. Prepare addenda as appropriate and provide to ARC <br />Reprographics for their distribution. A pre -Bid meeting is not included and if request will be <br />conducted by Client. Prepare bid tabulation, review bids, and recommend to Client regarding the <br />award of the construction contract. <br />Upon successful completion of the bidding phase, the following contruction services apply. <br />9. General Administration of Construction Contract. Consult with Owner and act as Owner's <br />representative as provided in the Construction Contract. The extent and limitations of the duties, <br />responsibilities, and authority of Engineer as assigned in the Construction Contract shall not be <br />modified, except as Engineer may otherwise agree in writing. All of Owner's instructions to Contractor <br />will be issued through Engineer, which shall have authority to act on behalf of Owner in dealings with <br />Contractor to the extent provided in this Agreement and the Construction Contract except as otherwise <br />provided in writing. <br />10. Pre -Construction Conference. Participate in a Pre -Construction Conference prior to commencement <br />of Work at the Site. The conference will be attended by Engineer. <br />11. Schedules. Receive, review, and determine the acceptability of schedules that Contractor is required to <br />submit to Engineer, including the Progress Schedule, Schedule of Submittals, and Schedule of Values. <br />Page 2 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />