My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Arcadis US Inc - Rehab of Raw Sewage Pump No 2
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Arcadis US Inc - Rehab of Raw Sewage Pump No 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:11:56 AM
Creation date
8/30/2018 9:43:08 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/28/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF UTILITIES <br />TO: Members of the Board of Public Works <br />Eric Horvath, Director of Public Works <br />Kara Boyles, City Engineer <br />Clara McDaniels, Board of Public Works Attorney <br />FROM; Al Greek, Director of Utilities <br />Jacob M. Klosinski, Assistant City Engineer <br />SUBJECT: Agenda Request Form — Professional Services Agreement <br />WWTP Raw Sewage Pump No. 2 Rehabilitation <br />DATE: August 21, 2018 <br />The Department of Public Works Division of Utilities is requesting the Board of Public Works <br />approval of a Professional Services Agreement with Arcadis U.S., Inc. to provide professional <br />engineering services to provide design specifications for the rehabilitation of the Wastewater <br />Treatment Plant Raw Sewage Pump No. 2. <br />Background <br />Over time Raw Sewage Pump No. 2 has exhibited a loss in pumping capacity. The current <br />pump and impeller is rated for 50 MGD. Over recent years full output of the pump has varied <br />between 45 — 48 MGD depending on the head conditions at the adjacent wet well and incoming <br />sewage flow rates. <br />Both Raw Sewage Pump No. 1 and Pump No. 3 are capable of 50 - 55 MGD flow rates. They <br />were both rebuilt in recent years and each has a larger impeller. A similar rehabilitation is <br />scheduled for Raw Sewage Pump No. 2. Raw Sewage Pump No. 2 was recently inspected and <br />overall, the condition of the volute is in good to fair condition. The pump does not require a <br />complete replacement but it does require rehabilitation so it can continue to provide the pumping <br />capacity needed for normal permitted flows. <br />This project is part of the Wastewater Treatment Plant's capital budget for 2018. This project <br />will be bid early in the fourth quarter with the intent to award the project prior to year's end. <br />The funding source for the Professional Services Agreement is Utilities, Sewage Works 1 <br />Wastewater Engineering, Account (641-0630-793-31-02). <br />If there are any questions regarding the subject project, please contact Al Greek (Ext. 4210) or <br />Jacob M. Klosinski (Ext. 9496) at the Division of Utilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.