Project Name
<br />Project No.,
<br />For Bids Due
<br />M A or_ Din
<br />BIDIPROPOSAL (Revised Aug 22,2018)
<br />CITY OF SOUTH BEND
<br />VPA Maintenance Storage Building
<br />11 8-046R
<br />August 28, 2018
<br />Item
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />No.
<br />Building Addition: pre-engineered metal
<br />1
<br />building addition delivered to site,
<br />I
<br />LS
<br />$154,11:3.00
<br />$154,113.00
<br />erection, roof panels, wall panels,
<br />insulation (superstructure)
<br />2
<br />Sectional OH Doors, operators, service
<br />1
<br />LS
<br />$26,943.00
<br />$26,943.00
<br />doors
<br />Excavation, Concrete foundation and
<br />LS
<br />3
<br />concrete floor slab (substructure)
<br />$114,945.00
<br />$114,945,00
<br />4
<br />Site work: Excavation, drywells, crushed
<br />LS
<br />Stone
<br />$94,108.00
<br />$94,108,00
<br />5
<br />Electrical Power and Lighting
<br />1
<br />LS
<br />$34,280M
<br />$34,280.00
<br />BASE BID TOTAL $424,389.00
<br />A! Tr.DKIATF: R4
<br />Item,
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />Unit price for from one to three concrete
<br />I
<br />aprons, as shown on C1.1 (alternates
<br />ea
<br />LS
<br />$1,500,00
<br />$1,500.00
<br />1 a, 1 b, I c)V All to be 19' x 6' x 6".
<br />ALTERNATE #1 EACH $1,500.00
<br />ALTERNATE #2
<br />Item
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price Total Amount
<br />1
<br />20'x 8' high gate with chain and pad lock.
<br />LS
<br />$3,060.00 $3,060.00
<br />ALTERNATE #2 TOTAL $3-DoMp—
<br />ALTERNATE #3
<br />Item
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />470 LF x 6' high chain link fencing with
<br />1
<br />one 16' x 6' high double gate on west
<br />470
<br />LF
<br />$35.89
<br />$16,870.00
<br />side, at curb cut near Sample Street.
<br />Bidder (Firm): R- Yoder Construction, Inc.
<br />Address: P.O. Box 69
<br />City/State/Zip: Nappanee, IN 46550
<br />ALTERNATE #3 TOTAL $16,8,70,00
<br />Telephone Number:,,,,,
<br />Voluntary Alternate: Revise building to have Galvalume Finish Roof Panels in lieu By
<br />of painted and revise clear height to be 13'1 " in lieu of 14'01" (Frame profile enclosed).
<br />Deduct: $17,500.00.
<br />(Printed Name of Person Signing)
<br />06-22!-2018 Contractor's Bid for Public Works - 1
<br />
|