Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: St. Joseph Street Improvements <br />Project Number: 118-008 <br />For Bids Due: August 28, 2018 <br />Contractor Name: Rieth-Riley Construction Co., Inc. <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />30 <br />HMA Surface, Type B <br />130 <br />TON <br />$ 127.10 <br />$ 16,523.00 <br />31 <br />HMA for Wedging, Intermediate Type B <br />42 <br />TON <br />$ 140.36 <br />$ 5,895.12 <br />32 <br />HMA Patching, Type B, Undistributed <br />80 <br />TON <br />$ 126.84 <br />$ 10,147.20 <br />33 <br />Curb and Gutter, Concrete <br />790 <br />LFT <br />$ 24.20 <br />$ 19,118.00 <br />34 <br />Standard Curb, Concrete <br />90 <br />LFT <br />$ 57.52 <br />$ 5,176.80 <br />35 <br />Sidewalk, Concrete, 4 IN <br />515 <br />SYS <br />$ 44.56 <br />$ 22,948.40 <br />36 <br />Curb Ramp, Concrete <br />60 <br />SYS <br />$ 173.15 <br />$ 10,389.00 <br />37 <br />PCCP for Approach, Reinforced, 6 IN <br />62 <br />SYS <br />$ 132.26 <br />$ 8,200.12 <br />38 <br />Light Standard, Type A <br />8 <br />EA <br />$ 6,413.70 <br />$ 51,309.60 <br />39 <br />Light Pole Foundation <br />6 <br />EA <br />$ 916.24 <br />$ 5,497A4 <br />40 <br />No. 4 Wire <br />1000 <br />LFT <br />$ 7,94 <br />$ 7,940.00 <br />41 <br />Conduit, PVC, Schedule 80, 2 IN <br />902 <br />LFT <br />$ 6.11 <br />$ 5,511.22 <br />42 <br />Conduit, PVC, Schedule 80, 3 IN <br />18 <br />LFT <br />$ 9.16 <br />$ 164.88 <br />43 <br />Lighting Handole <br />1 <br />EACH <br />$ 1,221.66 <br />$ 1,221.66 <br />44 <br />TESCO Cabinet w, Single Service, Foundation, Etc. <br />1 <br />EA <br />$ 7,370.66 <br />$ 7,370.66 <br />45 <br />Misc, Electrical <br />1 <br />LS <br />$ 1,445.63 <br />$ 1,445.63 <br />46 <br />Sawcut for Roadway Loop and Sealer <br />114 <br />LFT <br />$ 9.16 <br />$ 1,044.24 <br />47 <br />Roadway Loop Cable <br />675 <br />LFT <br />$ 0.61 <br />$ 411.75 <br />48 <br />Signal Handhole, Type 1 <br />1 <br />EA <br />$ 1,119.85 <br />$ 1,119.85 <br />49 <br />No. 16 Wire <br />115 <br />LFT <br />$ 3.05 <br />$ 350.75 <br />50 <br />Conduit, HDPE, 2 IN <br />158 <br />LFT <br />$ 14.25 <br />$ 2,25150 <br />51 <br />Loop Detector Housing <br />2 <br />EA <br />$ 621.01 <br />$ 1,242.02 <br />52 <br />Traffic Signal Head Improvement <br />1 <br />LS <br />$ 3,939.84 <br />$ 3,939.84 <br />53 <br />7C Wire <br />439 <br />LFT <br />$ 4.07 <br />$ 1,786.73 <br />54 <br />Thermoplastic Stop Line, White, 24 IN <br />45 <br />LFT <br />$ 5,80 <br />$ 261.00 <br />55 <br />Thermoplastic Crosswalk, Solid, White,12 IN <br />135 <br />LFT <br />$ 2.90 <br />$ 39150 <br />56 <br />Thermoplastic Line, Solid, White, 4 IN <br />150 <br />LFT <br />$ 0.55 <br />$ 82.50 <br />57 <br />Thermoplastic Line, Solid, Yellow, 4 IN <br />837 <br />LFT <br />$ 0.55 <br />$ 460.35 <br />58 <br />Thermoplastic Line, Broken, Yellow, 4 IN <br />120 <br />LFT <br />$ 0.55 <br />$ 66.00 <br />59 <br />Pavement Message Mark! ng,Thermoplastic, Lane Arrow <br />4 <br />EA <br />$ 152.71 <br />$ 610.84 <br />Version 7/20/2018 Contractor's Bid for Public Works - 8 <br />