My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - Ironwood Dr Pavement Rehabilitation and Intersection Proj No 117-071A - C&E Excavating Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Change Orders
>
Change Order No 3 - Ironwood Dr Pavement Rehabilitation and Intersection Proj No 117-071A - C&E Excavating Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 1:48:38 PM
Creation date
8/30/2018 8:42:46 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/28/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO: Board of Public Works <br />FROM: Toy Villa <br />Bureau of Public Construction <br />SUBJECT: Ironwood Drive Pavement Rehabilitation and Intersection <br />Project Number 117-071A <br />DATE: August 7, 2018 <br />Herewith is an explanation for the change order #3 being submitted. <br />The reason(s) for the change order request is as follows: <br />. Time extension due to waiting on the manufacture and delivery of traffic signal <br />Mast Arm Poles (MAP). The contractor submitted the order immediately <br />following approval but the supplier has an extensive lead time. After installation <br />of the MAPs the concrete sidewalk around the pole bases will be poured. <br />The cost for the work will be increased by $0.00. <br />This represents an increase of 0.00% for this change order. <br />This represents an increase of 32 days to the contract for this change order. <br />
The URL can be used to link to this page
Your browser does not support the video tag.