My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Jones Petrie Rafinski - EPA Mandated Groundwater Investigation Assistance
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Jones Petrie Rafinski - EPA Mandated Groundwater Investigation Assistance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:30:18 AM
Creation date
8/15/2018 11:07:18 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/14/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Scope of Work and Cost Proposal for Beck's Lake NPL/LaSalle Park Area <br />August 6, 2018 <br />Page 6 of 8 <br />LIMIITATIION!S/QUALIFICATIONS <br />The sampling and testing of soil, groundwater and/or other materials not specifically <br />identified in this proposal is beyond the scope of services for this project. Cost estimates <br />for our proposed services have been prepared based on the following additional <br />assumptions: <br />• Jones Petrie Rafinski will have unlimited access to the site during daylight <br />hours; <br />• No subsurface obstructions (buried utilities or fill debris) will interfere with <br />our work; <br />• Groundwater will be encountered within 35-feet of ground surface; <br />• Inclement weather will not interfere with the completion of our field work; <br />• Soil cuttings and puirge waters will be containerized and stored in the <br />fenced -in and lockable investigative derived waste area located on the north <br />side of the subject site pending proper disposal arrangements; disposal <br />costs are included in the appropriate task estimate. All borings will be filled <br />with bentonite pellets to land surface following soil sample collection. <br />AUTHORIZATION <br />Jones Petrie Rafinski appreciates the opportunity to be of service to, you on this <br />project and is prepared to commence work immediately upon your acceptance of <br />this Proposal. Should YOU have any questions or require additional information, <br />please contact me at (574) 232-4388. If acceptable, please execute the Proposal <br />by signature, where indicated and return a copy via email at <br />itroian(ED,ilprl source,com, We look forward to working with you on this project. <br />Sincerely, <br />R. J eph Tro /n�l <br />E I 0 <br />nvi onmental Project Manager <br />J:\ProposalslCity of South BendkBeck's Lake Scope of Work 2018 - Cost Proposal - Final 8-6-2018.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.