My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to PSA - Lochmueller Group Inc - Phase I Design for LWE Corridor Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Amendment to PSA - Lochmueller Group Inc - Phase I Design for LWE Corridor Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:25:46 AM
Creation date
8/15/2018 10:11:32 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/14/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
14. Disagreements between Owner and Contractor: Render formal written decisions on all duly <br />submitted issues relating to the acceptability of Contractor's work or the interpretation of <br />the requirements of the Contract Documents pertaining to the execution, performance, or <br />progress of Contractor's Work; review each duly submitted Claim by Owner or Contractor, <br />and in writing either deny such Claim in whole or in part, approve such Claim, or decline to <br />resolve such Claim if Engineer in its discretion concludes that to do so would be <br />inappropriate. In rendering such decisions, Engineer shall be fair and not show partiality to <br />Owner or Contractor and shall not be liable in connection with any decision rendered in good <br />faith in such capacity. <br />15.for Payntent., Based off Elngineef's <br />f <br />r-epfesefi�atien to <br />Engineer-7 , <br />point Y <br />(s*eef te ft-n evaluation of the Work as a ftmefiefling Whole Prior to or- upeft Substantial <br />Completion, to the results ef any s4sequei4 tests sailed for- ift the Geft4aet Deeiimentt <br />so fiff as it is Engineers fesponsibility to ebsefve 7 , <br />s Work. In the ease a <br />ef quantities and elassifieetiefts of 7 <br />Contyaetor-r-epr-eseftted that observations made by Engineer to eheek the quality or quantity —of <br />9 <br />Engineer'sWork beyond the fespeftsibilifies speeifieafly assigned tO EflgiHeff in this Agr-eeffieI4 <br />7 <br />Engineer's <br />iffeluding final payffiefft will impose an En --Msibility to s"efyise, <br />7 <br />7 <br />7 Y 7 7 <br />Gen4aeter7s eompliffinee with Laws and Regulations appheable to , <br />fiamishi — I . I mifig the Wark. R will also not impose respensibility en Engineer - <br />CA MAU <br />ss <br />H3V Work 3311J1Vg34sV, materials, equipmew has passed to Ownef free and eleaf of Etity <br />liens, 7 seetffity f 7 <br />of theA thefe may not be other ma# <br />at isstie be�ween Ownef and Gefttffietof that might aff-eet the amEmitt that should befeid, <br />Page 7 <br />(Exhibit K -- Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between owner and Engineer for Professional Services. <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.