My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to PSA - Lochmueller Group Inc - Phase I Design for LWE Corridor Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Amendment to PSA - Lochmueller Group Inc - Phase I Design for LWE Corridor Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:25:46 AM
Creation date
8/15/2018 10:11:32 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/14/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
z. <br />3. Subsurface Utility investigation <br />5. Environmental Documentation <br />6. Development of plans in accordance with INDOT requirements for the use of Federal Funds <br />7. Public involvement meetings or hearings <br />8. IDNR, IDEM, Roule 5, or USACOE permits of any kind <br />9. Right -of -Way review appraisals <br />10. <br />11. Sanitary sewer design <br />12. Water main design <br />13. Lighting design <br />14. Landscaping <br />15. Drainage design or improvements to the south curb line of Lincoln Way East <br />d. For the Additional Services or the modifications to services set forth above, Owner shall Pay <br />Engineer the following additional or modified compensation: <br />A. Additional $54,600.00 design fee lump sum <br />B. Additional $14,000.00 geotechnical engineering fee lump sum <br />C. Additional $5,000.00 not to exceed for bid phase services subject to hourly rates. <br />D. Additional $5,000.00 not to exceed for construction phase services subject to hourly <br />rates <br />ems: <br />[List other- Aaael*nents, if anyl <br />5. Agreement Summary (Reference only) <br />a. Original Agreement amount: $446,850.00 <br />b. Net change for prior amendments: $0,00 <br />c. This amendment amount: $78,600.00 <br />d. Adjusted Agreement amount: $525,450.00 <br />The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, <br />including those set forth in Exhibit C. <br />_..W Page 9 <br />(Exhibit Kâ Amendment to Owner -Engineer Agreement) â Attachment 1) <br />EJCAC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.