Laserfiche WebLink
11/3/2011 <br /> Elm <br /> • Connection between.South Bend's trail network acid . South.Bend 20-pear planning document—City Plans <br /> Mishawaka's trail system . Expressed desire for altema6ve forms of <br /> • Incorporate traffic calming measures along Nordiside transportation <br /> • Lack of alternative transportation routes . Additional recreational opportunities <br /> d4. AR9*, <br /> LFAVAVA LFAQ+SPA <br /> I � <br /> • Neighborhood Planning Meeting March 24,2010 Construction of concrete shared-use path <br /> . Two path alignments;participaniquestimmaire . 10 feet wide—21n to Ironwood(south side) <br /> • Focus Group Meeting August 19,2010 . 8 feet wide Ironwood to project terminus <br /> . home details <br /> • Focus Group Meeting October 27,2010 <br /> . Four alwmatives,alternative matrix,questionnaire <br /> • Preferred alternative selected November,2010 <br /> . City of South Bend websim am ommement <br /> LFATITI LFATITA <br /> . Roadway Closures . 4therproject Features <br /> • 26w Street to 27' Street and 36o Street to Logan . Project constructed within existing roadway R-W <br /> • Avoids physically impacting WPA Stone Wall . StormSewer(Noruside Boulevard—27ir Street to 350 <br /> . Northside Boulevard Reahgoment Street;new curb on south side) <br /> • 2 8-foot wide pavement section,path offset,driveways . Decorative Lighting <br /> • 290 Street to 32"Street <br /> et <br /> LFATITI LFATSTL <br /> 3 <br />