My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-10-2011 Intersection re-opens with natural creek, roundabout
>
Public
>
News Releases
>
2011
>
11-10-2011 Intersection re-opens with natural creek, roundabout
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2011 1:13:54 PM
Creation date
11/10/2011 1:13:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ti. <br /> s <br /> o� <br /> r <br /> 3 t3 <br /> At the same time, the original Angela/Riverside intersection featured roads that were <br /> offset with different widths and lane configurations. Further west, as Angela approached <br /> Woodward Avenue, a sharp vertical curve was not conducive to good traffic patterns. <br /> In addition to the green storm-water solution, engineers changed traffic flow to the <br /> intersection by: <br /> • Moving the intersection west, creating more park space along the river's edge south <br /> of Angela. <br /> • Creating a roundabout at the intersection, enhancing pedestrian safety. <br /> • Constructing a bridge along Riverside over the channel. <br /> • Extending a multipurpose path along Riverside up the hill (south of Angela) and <br /> along Angela(west of Riverside). <br /> • Adding additional parking for Brownfield Park along Angela and pedestrian-scale <br /> lighting along the new walkways. <br /> The new parking lot also helps shore up the 2.7-acre Brownfield Park, preventing future <br /> turf damage. A neighborhood basketball court also was expanded to full court in the <br /> project and two soccer goals with nets were installed. <br /> In a later phase of this storm-sewer project, a major trunk sewer will follow Diamond <br /> Avenue from Lincolnway to Walnut and Euclid, conveying storm water from a <br /> previously separated storm sewer in an area known as "Model Cities." <br /> South Bend is among nearly 800 U.S. cities that are mandated by the U.S. Environmental <br /> Protection Agency and the Clean Water Act to make investments upwards of$50 billion <br /> to improve water quality by separating lines that combine storm water and sewage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.