Laserfiche WebLink
STANDARD TERMS AND CONDITIONS ATTACHMENT D <br />1 INVOICE AND PAYMENT PROCEDURES: DLZ shall submit <br />invoices, once a month, at a minimum, to the OWNER for Services <br />accomplished during each calendar month, <br />The OWNER, as OWNER or authorized agent for the OWNER hereby <br />agrees that paymentwill be made for said Serviceswithin thirty (30) days <br />from the date of the invoice; and, in default of such payment, hereby <br />agrees to pay all cost of collection, including reasonable attorngs fees, <br />regardless of whether legal action is initiated. The OWNER hereby <br />acknowledges that unpaid invoiceshall accrue interestat 18 percentper <br />annum after they have been outstanding for over thirty (30) days, [fan <br />invoice remains unpaid sixty (60) days after the date of the invoice, DLZ <br />may, upon giving seven (7) days written notice of its intent to do so, <br />suspend all Services on the OWNER =s project. This suspension shall <br />remain in effect until all unpaid invoices are paid in full. If an invoice <br />remains unpaid ninety (90) days after the date of the invoice, DLZ may, <br />upon giving seven (7) days written notice of its intent to do so, declare <br />OWNER to be in breach of this Agreement and pursue its remedies for <br />collection. <br />2. CONSTRUCTION SERVICES: If, under this Agreement, <br />professional services are provided during the construction phase of the <br />project, DLZ shall not be responsible for or have control over means, <br />methods, techniques, sequences, or procedures; or for safety precautions <br />and programs in connectionwith the Work. Nor shall DLZ be responsible <br />for the Contractor -s failure to carry out the Work in aeeordancewith the <br />Contract Documentsor for Contractor -s failureto comply with applicable <br />laws, ordinanees,rules or regulations. Under no circumstanceswill DLZ <br />have any direct contractual relationship with the Construction Manager, <br />Contractor, any subcontractors, material suppliers or other consultants <br />unless DLZ and the Owner expressly agree otherwise in writing. <br />OWNER agrees that DLZ will perform on -site construction review for this <br />project and that such services will not be performed by others. <br />3. SUBSURFACE INVESTIGATION: DLZ makes no <br />representations eonc:er ainpoil conditionsunless specificallyincludedin <br />writing in this agreement,and DLZ is not responsiblefor any liability that <br />may arise out of the making or failure to make soil surveys,or sub - surface <br />soil tests, or general soil testing. <br />4._ AGENCY REV jLW: In the event that the plans, specifications, <br />and/or field work covered by this contract are those required by various <br />governmentalagencies and in the event, that due to change of policy of <br />said agencies after the date of this agreement, additional office or field <br />work is required, the said additionalworkshall be paid forby OWNER as <br />extra work. <br />5. SURVEY STAKING: In the event that any staking is destroyedby <br />an act of God or parties otherthan DLZ, the cost ofrestakingshallbe paid <br />for by OWNER as extra work. <br />6. MISCELLANEOUS (EXPENSES: The OWNER shall pay the costs <br />of checking and inspection fee, zoning and annexation application fees, <br />assessmentfees, soils engineeringfees, soilstesting fees, aerial topography <br />fees, and all other fees, permits, bond premiums, title company charges, <br />blueprintsand reproductions,and all othercharges not specifically covered <br />by the terms of this agreement. <br />7. CHANGE OF SCOPE: The Scope of Services set forth in this <br />Agreement is based on facts known at the time of execution of this <br />Agreement, including, if applicable, information supplied by DLZ and <br />OWNER, DLZ will promptly notif)OWNER of any perceived changes <br />of scope in writing and the parties shall negotiate modifications to this <br />Agreement before commencement of change in scope. <br />S. SAFETY: DLZ shall establish and maintain programs and <br />procedures for the safety ofits employees. DLZ specifically disclaims any <br />authority or responsibilityfor general job site safety and safety of persons <br />other than DLZ employees. <br />9. REUSE OF PROJECT DFr IVERABLES; Reuse of any <br />documentsor otherdeliverebles, including eleetroniemedia, pertainingto <br />the Project by OWNER for any purpose other than that for which such <br />documents or deliverablewere originallyprepared, or alternationof such <br />documentsordeliverableswithout written verification oradaptionbyDIZ <br />for the specific purpose intended, shall be at OWNERS sole risk. <br />10. OPIMONS OF CONSTRUCTION COST: Any opinion of <br />constructioncosts preperedby DLZ is suppliedtbr the general guidance of <br />theOWNERonly. Since DLZ has no control over competitivebiddingor <br />market conditions,DLZ cannot guaranteethe accuracy of such opinions as <br />compared to contract bids or actual cost to OWNER. <br />11. INSURANCE: DLZ will maintain insurance coverage for <br />Professional, Comprehensive General, Automobile, Workers --s <br />Compensation and Employers Liability in amounts in accordance with <br />legal, and DLZ business, requirements, Certificates evidencing such <br />coverage will be provided to OWNER upon request. For projects <br />involving construction, OWNER agrees to requite its construction <br />contractor, if any, to include DLZ asm additional insured on its policies <br />relatingto the ProjecL DLZ coveragereferencedabove04 in such case, <br />be excess over contractops primary coverage. <br />12. INDEMNITY-' To the fullestextent permitted by IawJDL.Z shall <br />indemnifyand save harmless from and against loss, liability,and damages <br />sustained by OWNER, its employees, and representativesby reason of <br />injury or death to persons or damage to tangible property to the extent <br />caused directly by the negligence of DLZ or its employees. <br />13. LIMITATIONS OF LIABILITY: No employeeofDlZ shall <br />have individual liability to OWNER. OWNER agrees that, to the fullest <br />extent permitted by law, DLZ-s total liab0ityto OWNER for any and all <br />injuries, claims, losses, expensesordamageswhatsoeverarisingout of or <br />in any way related to the Project or this Agreement from any causes <br />including, but not limited to, DLZ =s negligence, error, omissions, strict <br />liability, or breach of contract shall not exceed the total compensation <br />received by DLZ under this Agreement If OWNER desires a limit of <br />liabllitygreaterthan provided above, OWNER and DLZ shall include in <br />the Agreementthe amount of such limit and the additionalcompensation <br />to be paid b DLZ for assumption of such risk. <br />14. MU-AILING KPARTYL TIC ONCOSTS: Intheeventany <br />actions am broughtto enforcethis Agmemmt,theprevaaing party shun be <br />entitled to collectits lftigationcosts from the other party. Any litigation <br />shall be governed by the laws of the state of Indiana. <br />15. AUTAORLTY: The persons signing this Agreement warrant that <br />they have the authorityto sign as, oron behalfof, the partyforwhom they <br />are signing. <br />16. STATUTE OF LIMITATIONS: To the fullest extent permitted by <br />law, parties agree that, except for claims for indemnification, the time <br />period for bringing claims regarding DLZ =s performance under this <br />Agreement shall expire one year after Project Completion. <br />Revised 2/02 M:1AoposalslP 101 ransporta6onlLawtoa Fi�hulAoquishion Smiaa �grumpdAn�cbmem D TumCond.doc <br />