My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006 Performance Based Budget
sbend
>
Public
>
Finance
>
Budgets
>
2006
>
2006 Performance Based Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2014 10:58:02 AM
Creation date
12/19/2007 10:33:53 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
532
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a 48 or 96 gallon container. They are helping to keep our alleys and streets cleaner and make us <br />more efficient. Our Traffic Division applied four miles of Theram~oplastic material and 228 miles <br />of yellow or white paint stripes to make our streets safer. We installed ar repaired 575 street <br />Warne signs, 350 stop signs and 515 informational, regulatory or warning sigos. Twelve School <br />and pedestrian signs were upgraded to the new standard yellow diamond grade material. Our <br />sign shop designed and built over 500 specialty signs. We also set up for 58 special events <br />{various runs, walks and parades) and delivered <br />barricades for over 62 block parties. The <br />Lighting Division maintains 3,000 street and <br />pedestrian lights throughout the city, does <br />quarterly inspections and changes 8,500 bulbs at <br />traffic signals, and replaces light poles and <br />traffic control cabinets that have been damaged <br />in accidents. Little things do make a difference <br />in keeping the city safe and clean. <br />One of the great benefits of living in the city is having municipal water and sewer service <br />rather than well and septic. Our utilities do an exceptional job and are truly an economic <br />development asset. In 2005 the Water Works pumped over 7.2 billion gallons of water. That's <br />20 million gallons per day! All high quality. The water in our system exceeds every drinking <br />water standard established by the EPA. Our groundwater has high concentrations of iron and <br />manganese which can cause discolored water. Ten years ago this was our most critical problem <br />but investments that we have made in filtration plants and renovations have rendered that <br />problem almost non existent in our system. Construction and maintenance crews are responsible <br />for 42,000 service lines, 545 miles of water lines, 5,100 fire hydrants and 7,500 amain line valves. <br />During even the worst weather, we quickly responded to 81 water main leaks which generally <br />occur during freeze thaw cycles when the ground shifts. l7uring the summer, over 1,100 <br />hydrants were painted with fresh coats of red, white and blue paint. We just received IURC <br />approval of our rates (after more than a year). This will allow us to develop two new high <br />capacity wells, embark on a meter replacement program, add GAC filters to the South well field <br />and complete the infrastructure for a new North well field. <br />A-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.