Laserfiche WebLink
South Bend Redevelopment Commission <br /> Regular Meeting—August 23, 2011 <br /> A. South Bend Central Development Area <br /> (2) Resolution No. 2933 approving and <br /> authorizing the execution of an Addendum <br /> to the Master Agency Agreement <br /> (Memorial Hospital Streetscape <br /> Improvements Project, Bid Packages 3 <br /> and 4. <br /> Mr. Relos noted that Resolution No. 2933 <br /> and its Addendum to the Master Agency <br /> Agreement deals with the next two phases of <br /> streetscape improvements around the <br /> Memorial Hospital campus. This Addendum <br /> is for Supplemental Agreement No. 2 from <br /> DLZ, which, through the Board of Public <br /> Works, will design and prepare construction <br /> and final plans, perform surveying, right of <br /> way platting, utility engineering, and will <br /> provide a statement of probable construction <br /> costs for those next two phases. <br /> The main improvement projects to be <br /> completed around the Memorial campus in <br /> the next three years are: <br /> • Demolition of selected structures and <br /> parking lot improvements on both the <br /> east and west sides of the 400 block <br /> of N. Michigan St. <br /> • Facade improvements to the buildings <br /> on the east side of Michigan between <br /> Bartlett and Navarre, the Mar Main <br /> Pharmacy building, and the skywalk <br /> over Michigan St. <br /> • A new, more prominent entrance <br /> road, which will allow visitors to <br /> more readily identify where to enter <br /> the hospital. This new road will be <br /> called Park Lane. <br /> 6 <br />