My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6D (4)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
07-26-11 Packet
>
6D (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 2:07:43 PM
Creation date
7/22/2011 2:31:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT F <br />Site Improvements to be Provided by Commission <br />1. Storm water harvesting eliminating need for storm water retention on site <br />2. On -site utility laterals outside building <br />3. Parking lot and access for on -site circulation (passenger and truck) <br />4. Generator enclosure <br />5. Landscaping <br />6. Lighting <br />7. Cost of construction drawings for Enhancements No. 1. <br />8. Utility laterals from the outside boundary of the Property <br />DETAILS AND COSTS FOR SITE IMPROVEMENTS SHALL BE PROVIDED AS SOON AS <br />AVAILABLE AND PRIOR TO SELECTION BY PARTIES PURSUANT TO PARAGRAPH <br />7(b) <br />
The URL can be used to link to this page
Your browser does not support the video tag.