Laserfiche WebLink
May 4, 2011 mm <br />City of South Bend <br />Proposal for Professional Services <br />LaSalle Square, Phase One - Roadway and Utility Design ABONAAARCNE <br />Bonds Avenue Extension and New City Street Adjacent to Library Page 4 of 5 <br />APPENDIX B <br />SCHEDULE OF FEES <br />Abonmarche will be paid a not -to- exceed amount of $62,400.00 for performing the Scope <br />of Services as described in Appendix A. Abonmarche will invoice the City on a monthly <br />basis for the percentage of work completed for the lump sum tasks listed below. <br />Task#1: Field Survey ..................................................................... ..............................$ 5,500.00 <br />Task #2: Phase One Environmental Site Assessment (Restaurant Property) ........$ 2,000.00 <br />Task #3: Asbestos Investigation (Restaurant Property) <br />a) Site Inspection and Report ....................................... .............................$1 200.00 <br />b) Remediation Specifications .............. ............................... ......................$1,300.00 <br />Task #4: Demolition Bid Documents (Restaurant Property) ..... ..............................$ 6,500.00 <br />Task #5: Engineering Design <br />a) Sanitary Sewer and Water Main Relocation Design ..........................$ 7,000.00 <br />b) Roadway and Drainage Design .......................... ..............................$ 25,000.00 <br />Task #6: Soil Erosion and Sedimentation Control Permit .......... ..............................$ 2,400.00 <br />Task #7: Construction Bid Documents ....................................... ..............................$ 9,000.00 <br />Task #8: Construction Administration ......................................... ..............................$ 2,500.00 <br />TOTAL LUMP SUM AMOUNT ........................................................... ............................... $ 62,400.00 <br />MAXIMUM HOURLY RATES BY JOB CLASSIFICATION <br />(for any additional services under this agreement) <br />CLASSIFICATION HOURLY RATE <br />Principal <br />$200.00 / hr. <br />Vice President / Senior Project Manager <br />$155.00 / hr. <br />Project Manager <br />$108.00 / hr. <br />Project Engineer / Architect / Landscape Architect <br />$105.00 / hr. <br />Staff Engineer / Architect / Landscape Architect <br />$ 85.00 / hr. <br />Junior Engineer / Architect <br />$ 72.00 /hr. <br />Computer / Drafting Technician <br />$ 72.00 /hr. <br />Urban Planner <br />$ 80.00 / hr. <br />Professional Land Surveyor <br />$105.00 / hr. <br />One -Man GPS Crew <br />$105.00 / hr. <br />Two -Man Survey Crew with Total Station <br />$120.00 / hr. <br />Two -Man Survey Crew with GPS Station <br />$180.00 / hr. <br />Engineers Landscape Architects Planners Surveyors <br />