Laserfiche WebLink
operation or for violating any pretreatment standard or requirement, the <br />City may at any time, on its own initiative or in response to a petition <br />received from a uUser, and in accordance with procedures in 40 CFR <br />403.8(t)(6), determine that such u User should `not be considered a <br />sSignificant €Industrial uUser. <br />L) ,Significant noncompliance or (SNQ sha4 means: <br />(a) �D Chronic violations of wastewater dDischarge limits, defined here <br />as those in which sixty -six (66) percent or more of wastewater <br />measur-emews taken all of the measurements taken for the same pollutant <br />parameter during a six - month period exceed (by any magnitude) the daily <br />maximum limit er- avmge limit for- the same pellWant pammeter by my <br />affie a numeric Pretreatment Standard or Requirement, including <br />instantaneous limits as defined by 40 CFR 403.3(l); <br />(b) Q Technical (Review eCriteria (TRC) violations, defined here as <br />those in which thirty -three (33) percent or more of w,,ste ate- all of the <br />measurements taken for eaeh the same pollutant parameter during a six - <br />month period equals or exceeds the product of the daily maximum limit -EW <br />the— average —limit the numeric Pretreatment Standard or Requirement <br />including instantaneous limits, multiplied by the applicable c-ritefia TRC <br />T( RC ° 1.4 for BOD, TSS, fats, oils and grease, and 1.2 for all other <br />pollutants except pH); <br />(e) fl) Any other die violation of a Pretreatment Standard or <br />Requirement that the Director des determines has caused, alonge or in <br />combination with other dDischarges, ilnterference or pl?ass tThrough <br />(including endangering the health of Bureau POTW personnel or the <br />general public); <br />(d) (0 Any discharge of a pollutants that has caused imminent <br />endangerment to to pub! human health, welfare, or to the <br />environment, or has resulted in the $ereau's POTW's exercise of its <br />emergency authority to halt or prevent such a discharge; <br />(0 M Failure to meet, within ninety (90) days of after the scheduled date, <br />a compliance schedule milestone contained in a wastewater discharge <br />permit or enforcement order for starting construction, completing <br />construction, or attaining final compliance; <br />(f) f Failure to provide, within thirty (30) days after the due date, any <br />required reports, ifieludin g such as baseline monitoring reports, ninety (90) <br />day compliance reports, periodic self monitoring reports, and reports on <br />compliance with compliance schedules; <br />15 <br />