Laserfiche WebLink
required under Appendix "A "; and, if authorized in advance by the <br />OWNER, overtime work requiring higher than regular rates. <br />B. Method of Payment for Design Services <br />1. The ENGINEER may submit a maximum of one invoice voucher per <br />calendar month for work covered under this Agreement. The invoice <br />voucher shall be submitted to the OWNER. The invoice voucher shall <br />represent the value, to the OWNER, of the partially completed work as of <br />the date of the invoice voucher. The ENGINEER shall attach thereto a <br />summary of each pay item in Section A.2 of this Appendix, percentage <br />completed and prior payments. <br />2. The OWNER, for and in consideration of the rendering of the engineering <br />services provided for in Appendix "A ", agrees to pay to the ENGINEER for <br />rendering such services the fees established above in the following <br />manner: <br />a. The amount invoiced based upon percent complete or the contract <br />unit price, except that: <br />1. The maximum payment for road design and plans shall be in <br />accordance with the following schedule: <br />a.) Final 30% Alignment Plans 100% <br />2. Payment for any item not otherwise set out herein shall be <br />made based upon percentage of completion. <br />3. The OWNER, for and in consideration of the rendering of the engineering <br />services provided for in Appendix "A ", agrees to pay the ENGINEER for <br />rendering such services the fee established above upon completion of the <br />work thereunder and acceptance thereof by the OWNER. <br />4. The OWNER, for and in consideration of the rendering of the additional <br />services provided in Appendix "E ", agrees to pay the ENGINEER for <br />rendering such services the payments established above upon completion <br />of the work thereunder and acceptance thereof by the OWNER. <br />5. If design changes are required during construction due to design errors in <br />the final plans or specifications, the ENGINEER will make such necessary <br />design changes without additional cost to the OWNER. However, if <br />design changes are required during construction which are occasioned by <br />changed conditions or conditions which could not have been reasonably <br />foreseen by the ENGINEER prior to construction, the ENGINEER will be <br />paid for such modifications on the basis of actual hours of work performed <br />by essential personnel exclusively on this contract at the employee hourly <br />rate in accordance with the ENGINEER's fee structure attached as <br />Exhibit B to this Agreement. <br />3 of 4 <br />Appendix "D" <br />