Laserfiche WebLink
C. The ENGINEER shall perform the following services: <br />1. The ENGINEER shall perform the design of this Project on the basis that <br />the project shall be funded with local construction funds. Design changes <br />due to alternate funding of the project shall be considered Additional <br />Services, which shall be covered in Appendix "E" of this agreement. <br />2. The project will be designed in English units and in accordance with the <br />following references, policies and guidelines: <br />• City of South Bend Standards and Specifications <br />• A Policy on Geometric Design of Highways and Streets, American <br />Association of State Highway and Transportation Officials. <br />• Roadside Design Guide, American Association of State Highway <br />and Transportation Officials. <br />• Standard Specifications, Indiana Department of Transportation. <br />• Road and Bridge Memoranda, Indiana Department of <br />Transportation <br />• Design Manuals — Part 1, ll, V, and Vll to IX, INDIANA Department <br />of Transportation. <br />• Indiana Manual on Uniform Traffic Control Devices for Streets and <br />Highways, (IMUTCD). <br />3. The ENGINEER shall prepare (1) one set of 30% Review Plans and a <br />preliminary statement of probable construction cost for the OWNER'S <br />review and comment. <br />4. When authorized by the OWNER, the ENGINEER shall: <br />a. Order a title and encumbrance report for each parcel from which <br />there will be a taking. <br />b. Prepare a plat and legal description for each parcel of right of way <br />to be acquired, both permanent and temporary. <br />C. Order title and encumbrance updates, as required. <br />Any modifications to the appraisal price or changes in the plans <br />recommended during negotiations must be approved by the OWNER. <br />5. After approval of the 30% Plans, the ENGINEER, shall: <br />a. When specifically authorized by the OWNER, the ENGINEER shall <br />engage, as subconsultants, two appraiser(s) and cause each <br />acquisition parcel to be appraised by each appraiser. The <br />appraiser shall determine the type of appraisal required and submit <br />this to the ENGINEER for approval prior to beginning the <br />appraisals. All such appraisals shall be reviewed by the <br />ENGINEER and then forwarded to the OWNER for review. <br />b. When the appraiser advises that he requires the right of way taking <br />to be staked so that the appraisal process can proceed, the <br />ENGINEER will mark the point where the new right of way line <br />crosses each property line and will mark each property corner <br />within the proposed taking. When directed, the ENGINEER will <br />stake the existing right of way lines to assist the property owner to <br />2 of 4 <br />Appendix "A" <br />