Laserfiche WebLink
The City reminds people that some delays may be expected during rush hours and asks motorists <br /> to drive slowly through the restricted area To ensure the safety of the crews as well as drivers <br /> and pedestrians, everyone is encouraged to please drive slowly and use caution in the Work <br /> Zone. <br /> Phase 1 Widening and construction of new center turn lane—May 1- <br /> (See attached map for details) <br /> • Traffic on Michigan St. will be restricted to the outside north and southbound lanes. <br /> — Northbound Michigan St., from the Bypass to Sherwood St., will be one lane and <br /> no left turns will be allowed north of Ireland Rd. <br /> — Southbound Michigan St. will be one lane and no left turns will be allowed <br /> between Chippewa and Ireland Rd. <br /> • Chippewa Ave. will be closed to east and westbound through traffic, from east of <br /> Michigan St. west to Main St., for installation of a portion of the new storm sewer <br /> system. <br /> — Northbound traffic on Michigan St. turning west on Chippewa will be <br /> detoured one block north to Sherwood St. then use Main St. to travel south, <br /> back to Chippewa. <br /> — Southbound traffic on Main St. may continue southbound on Main, around the <br /> curve to Michigan Street, but may not turn east on Chippewa <br /> *Suggested route for motorists desiring to go east on Chippewa: Turn east <br /> on Donmoyer to Fellows St., then south on Fellows to head back to Chippewa. <br /> • Note: Ireland Rd. will remain open during this phase. <br /> Phase 2 of the project will consist of construction of sidewalks, curbs, drive approaches, street <br /> approaches and a portion of the storm sewer system on the east side of Michigan St., from <br /> Chippewa to Ireland Rd. Phase 2 is expected to last six to eight weeks. <br /> Phase 3 will consist of construction of sidewalks, curbs, drive approaches, street approaches, and <br /> a portion of the storm sewer system on the west side of Michigan St., from Chippewa to Ireland <br /> Rd. Phase 3 will continue until project completion. <br /> - 30 - <br />