Laserfiche WebLink
South Bend Redevelopment Commission <br /> Regular Meeting—April 12, 2011 <br /> staff has also been working on street and <br /> intersection improvements on Ireland Road at <br /> High Street and doing related storm water <br /> management work at the Erskine Plaza Ponds <br /> located north of Erskine Plaza. <br /> As city staff has been working on the above <br /> projects, and also preparing for the impacts <br /> of the INDOT upgrade of US 31, staff has <br /> asked Christopher B. Burke Engineering Ltd. <br /> staff to help coordinate these infrastructure <br /> projects in an overview format as well as <br /> begin a study of the Fellows and Ireland and <br /> Fellows Street north to Chippewa in <br /> preparation of the INDOT plan to bridge the <br /> US 20 Bypass with a new connector roadway <br /> on the Fellows Street alignment from Gilmer <br /> Park south of the bypass to the intersection of <br /> Ireland and Fellows. The state anticipates <br /> that roadway to be completed in 2013. <br /> Christopher Burke Engineering proposes to <br /> segment work into three initial phases and do <br /> the following work: <br /> 1. Community Plan Development <br /> 2. Survey and Geotechnical Investigation <br /> 3. Concept Plan Development <br /> After a plan is completed, the project will <br /> move into a construction plan design phase <br /> and then to construction. A report of the plan <br /> concepts and design plan will be presented to <br /> the Commission and Board of Works for <br /> comment before moving into the final phase <br /> of work. <br /> Staff requests approval of Resolution No. <br /> 2865 and the Addendum To Master Agency <br /> Agreement for the Fellows Street Corridor <br /> Improvement Project. <br /> The work we propose to do is put together <br /> 23 <br />