My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 36-2018 - Services to Annexation Area in German Township
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Resolutions
>
Resolution No. 36-2018 - Services to Annexation Area in German Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 11:13:59 AM
Creation date
7/25/2018 10:26:00 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Resolutions
Document Date
7/24/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Chocolate Annexation Area 6 <br />SECTION Ill. MUNICIPAL SERVICES <br />A. Public Works <br />Sewer - The nearest sanitary sewer to the west originates at the existing lift station near US <br />20 and Poppy Road. The City is currently designing a sewer extension that will run along the <br />south side of US 20 from the northwest corner of the Annexation Area to the lift station. The <br />lift station has sufficient capacity to accept flows from the Annexation Area. <br />Development of the site requires City approval of a drainage plan that meets the City's <br />requirement to store on site all runoff from developed areas. Connection to the City storm <br />sewer is not permitted. <br />Water- The South Bend Water Works currently has a 16" water main that runs on the north <br />side of US 20 from Olive Road to Pine Road. This water main would provide sufficient capacity <br />for the Annexation Area. The petitioner would likely need to connect to the water line by <br />boring under US 20. A 12" water main is located along the west side of Pine Road. The <br />petitioner may wish to connect to both water mains to provide redundancy to the project site. <br />Extensions of, or taps into sanitary sewer and water lines shall be governed by state law and <br />the rules and regulations of the South Bend Water Works and Sewer Utility, The Annexation <br />Area may be subject to system development charges for both water and sewer services. <br />Street Lighting -- Street lighting is provided along US 20 (Lincolnway West) within the <br />Annexation Area. Should any additional lighting be necessary, street lighting on wood poles <br />with overhead wiring can be provided through an ongoing contract with Indiana Michigan <br />Power. If the developer wishes to construct and dedicate additional street lighting, especially <br />of a decorative nature or with underground wiring, the City may accept it for maintenance and <br />operation, supported by property tax revenue. <br />Waivers of Annexation - No waivers of right to remonstrate against annexation are in effect <br />for this area. <br />Streets - No new public streets are proposed with this annexation. The annexation would add <br />a portion of US 20 (Lincolnway West) to the city limits, but US 20 will continue to be <br />maintained by the Indiana Department of Transportation following annexation. If the project <br />site is accessed at the US 20-Olive Road intersection, INDOT may require the petitioner to <br />make improvements there and to the adjoining on and off ramps at the US 20-St. Joseph <br />Valley Parkway (Bypass) interchange. Depending on the location of access to the project site, <br />a City Curb Cut Application or INDOT permit will be required for any new driveway approaches. <br />The petitioner would be responsible for installing sidewalks along public streets as the project <br />develops. <br />
The URL can be used to link to this page
Your browser does not support the video tag.