My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - 2018 Lamppost Program Proj No 118-033 - Gama Sonic USA Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Quotes - 2018 Lamppost Program Proj No 118-033 - Gama Sonic USA Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 9:18:02 AM
Creation date
7/25/2018 10:04:19 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/24/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
16 <br />oN OFF <br />Operation Switch <br />Fig. 1 Fig, 2 Fig. 3 <br />Assembly Instructions <br />GS-97NF <br />Place Lamp Part (A) on top of your existing 3" post and <br />tighten the 3 screws provided to secure the lamp. <br />GS-97NF21GS-9NF3: <br />1. Screw Arm part (B) onto part (C). There are 2 screw <br />holes per arm; one is on the inside bottom and one <br />is on the outside top. <br />2. Repeat step 1 twice for the GS-97NF2 and 3 times <br />for GS-97NF3. <br />3. Once step 2 is complete insert Part (D) into Part (C) <br />and secure with provided screws Part (H). <br />4. Place Part (C) on top of Pole and tighten the screws <br />Part (H). <br />5. Place lamp Part (A) onto the arm and secure with <br />the screws Part (F). Repeat twice in model GS- <br />97NF2 and 3 times in model GS-97NF3. <br />6. Place the lights on top of existing 3" post and <br />secure the Part (C) with screws provided. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.