Laserfiche WebLink
A1.03 Final Design Phase <br />A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of <br />probable Construction Cost as determined in the Preliminary Design Phase, and any other <br />deliverables subject to any Owner -directed modifications or changes in the scope, extent, character, <br />or design requirements of or for the Project, and upon written authorization from Owner, Engineer <br />shall: <br />1. Prepare final Drawings and Specifications indicating the scope, extent, and character of the <br />Work to be performed and furnished by Contractor. <br />2. Provide technical criteria, written descriptions, and design data for Owner's use in filing <br />applications for permits from or approvals of governmental authorities having jurisdiction <br />to review or approve the final design of the Project; assist Owner in consultations with such <br />authorities; and revise the Drawings and Specifications in response to directives from such <br />authorities. <br />Advise Owner of any adjustments to the opinion of probable Construction Cost known to <br />Engineer. <br />4. Perform or provide the following additional Final Design Phase tasks or deliverables: <br />a. Full set of Construction Documents and specifications that meet City of South Bend / <br />Board of Public Works requirements for the agreed upon design. <br />b. Preparation of coordination meetings with Owner. <br />5. Prepare and furnish bidding documents for review by Owner, its legal counsel, and other <br />advisors, and assist Owner in the preparation of other related documents. Within Fourteen <br />14 days of receipt, Owner shall submit to Engineer any comments and, subject to the <br />provisions of Paragraph 6.01.G, instructions for revisions. <br />6. Revise the bidding documents in accordance with comments and instructions from the <br />Owner, as appropriate, and submit Three 3 final copies of the bidding documents, a <br />revised opinion of probable Construction Cost, and any other deliverables to Owner within <br />Fourteen 14 calendar days after receipt of Owner's comments and instructions. <br />B. Engineer's services under the Final Design Phase will be considered complete on the date when the <br />subrnittals required by Paragraph A1,03,A.6 have been delivered to Owner. <br />C. In the event that the Work designed or specified by Engineer is to be performed or furnished under <br />more than one prime contract, or if Engineer's services are to be separately sequenced with the <br />work of one or more prime Contractors (such as in the case of fast -tracking), Owner and Engineer <br />shall, prior to commencement of the Final Design Phase, develop a schedule for performance of <br />Engineer's services during the Final Design, Bidding or Negotiating, Construction, and Post - <br />Construction Phases in order to sequence and coordinate properly such services as are applicable to <br />the work under such separate prime contracts. This schedule is to be prepared and included in or <br />Page 3 <br />(Exhibit A — Engineer's Services) <br />j JCDC E-500 Agreement Behveen Owner and Engineer Far Professional Services <br />Copyright C$ 2008 National Society orProresslonal Engineers for EJCDC. All rights resetwed. <br />